Demolition, site work and new construction of a municipal facility in Willard, Missouri. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

All wages paid for work under this Contract shall comply with requirements of the prevailing wage law of the State of Missouri, Sec 290.210 et seq., RSMo., as amended by the Division of Labor Standards, State of Missouri, and regulations promulgated by the Division of Labor. For any contract for services greater than $5,000, the successful bidder shall comply with 285.530, RSMo., as amended, and (1) provide by affidavit affirmation that it does not knowingly employ any person who is an unauthorized alien and (2) provide documentation affirming its enrollment and participation in a federal work authorization program with respect to the employees working in connection with this contract. The required documentation affirming enrollment must be from the federal work authorization program provider. A letter from the respondent reciting compliance is not sufficient. All bids should include the signed and notarized Work Authorization Affidavit and the electronic signature page from the E-Verify program. A letter from the Contractor reciting compliance is not sufficient. The City is committed to providing opportunities to DBE, MBE, and WBE prime, general, and subcontractors and encourages such business enterprises to submit responses. The cutoff for any questions about this bid is April 10, 2024, at 10:00 A.M. (CST). All wages paid for work under this Contract shall comply with requirements of the prevailing wage law of the State of Missouri, Sec 290.210 et seq., RSMo., as amended by the Division of Labor Standards, State of Missouri, and regulations promulgated by the Division of Labor. PREVAILING WAGE: All labor utilized in the construction of this project shall be paid a wage of no less than the prevailing hourly rate of wages for work of a similar character in this locality, as established and amended at any time by the Department of Labor of the State of Missouri, in accordance with prevailing wage as set forth in Annual Missouri State Wage Determination No. 30, Section 039, Greene County, and all addenda, and fully complied with the provisions and requirements of the Missouri State Prevailing Wage Law (Section 290.250, RSMo.), or by the U.S. Secretary of Labor in accordance with the Federal Davis-Bacon Act (Title 40 U.S.C. Chapter 31, subchapter IV), whichever is higher. In addition, the Contractor agrees to pay wages not less than once a week. The Contractor and all subcontractors will be required to furnish an Affidavit of Compliance form to the City stating that he has fully complied with Missouri Prevailing Wage Law. No payment will be legally made by the City to the Contractor until the affidavit is filed in proper form and order with the City. (Section 290.290 and 290.325, RSMo.) The Contractor shall post and maintain in a prominent and easily accessible location a clearly legible statement of all prevailing hourly wage rates to be paid to all workers employed by the Contractor and each subcontractor, and this notice must be posted during the full-time that any worker is employed on the job. (Section 290.265, RSMo.) It shall be the responsibility of the Contractor to notify the Division of Labor Standards when a violation of the law is discovered. The Contractor shall submit to the Construction Inspector monthly certified copies of payrolls including any subcontractors that may be working that month. If Davis-Bacon is in effect, certified payroll reports must be submitted weekly. The Contractor will forfeit a penalty to the City of Springfield of $100.00 per day (or portion of a day) for each worker that is paid less than the prevailing rate for any work done under the contract by the Contractor or by any subcontractor (Section 290.250, RSMo.). For detailed information on rules and occupational titles, see 8 CSR 30-3.010 through 3.060. In cases of a wage subsidy, bid supplement, or if a rebate was provided, and if so, if it was provided lawfully, the amount and date of such subsidy, supplement, or rebate must be reported to the City of Springfield within thirty (30) days of receipt of payment. (Section 290.095, RSMo.) All wages paid for work under this Contract shall comply with the requirements of the prevailing wage law of the State of Missouri, Sec 290.210 et seq., RSMo., as amended by the Division of Labor Standards, State of Missouri and regulations promulgated by the Division of Labor, or by the U.S. Secretary of Labor in accordance with Federal Davis-Bacon Act (Title 40 U.S.C. Chapter 31, subchapter IV), whichever is higher. The City of Springfield hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this solicitation, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for the award. Failure to comply with the requirements of the Prevailing Wage Law can result in civil action, including an injunction stopping work on a project, and in criminal fines of up to $500.00 and up to six months imprisonment for each day there is a violation.

Bid Results

Municipal

$3,464,386.00

Public - City

Demolition, New Construction, Site Work

1

6

69

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
30
Bidding Soon
355
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

3545 W Farm Rd 34, Willard, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.