Demolition and site work for a municipal facility in Yuma, Arizona. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Scope of Work: Demolition Requirements and Specifications Yuma County Facilities Management seeks to engage qualified general contractors to assist with the proper demolition of two (2) vacant buildings in downtown Yuma, located at 217 S. 2nd Avenue, Yuma, Arizona 85364. Demolition work will include the demolition and removal of buildings, foundations, a metal carport, and paving as well as grading the lot for proper water drainage. Demolition and all related work must be completed by June 30, 2024. The successful respondent shall be referred to herein as the "Contractor." Please review the Asbestos Inspection Report by Nicklaus Engineering, Inc. (NEI Project 022-0110) for reference as a part of this RFP. Proposal Instruction The pre-proposal conference shall be all day (8 AM to 5 PM) on the date specified in Attachment A and will allow for a walk through of the building. Each contractor is responsible for bringing tools and ladders that they need for their inspections. The contractor must verify all measurements and construction materials. Take note that no architectural or engineering drawings are provided, the contractor is responsible for making their best judgment. Please include in your proposal the cost and duration of the project. As a reminder, a proposal bond is required. Summary This Scope of Work includes the following components with respect to the Property: 1. Include City of Yuma requirements for obtaining a permit for demolition, dust control, abatement and traffic control, as well as any other requirements for properly disposing of any hazardous materials. The Contractor shall properly dispose of all materials according to state and local regulations. 2. All equipment and materials in the building are the property of the Contractor. Yuma County Facilities Management is not salvaging equipment that is present during the pre-proposal conference. 3. The Contractor shall coordinate utility disconnection with the utility provider. It is the responsibility of the contractor to terminate/cap the sewer, water and electrical at the point of connection with the provider. 4. The property shall be fenced off from the time construction begins until all equipment is removed and the project is complete. The construction work schedule shall be adjusted to before or after standard business hours if excessive dust or traffic will be present. 5. Include the cost for trash containment/bin and haul off. 6. Include the costs for adding construction signs per OSHA, state and local regulations. 7. After demolition, grade as required by state and local regulations. Preferably, use fill dirt to ensure proper drainage out and away from the property. 8. The final outcome will be an empty compacted dirt lot with no trip hazards. 9. For project close-out and final payment, include any pertinent pictures, permitting documentation and contractual documents. RFI Deadline3/25/2024 at 5:00 PM

Award

Municipal

$120,010.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
48
All Active Projects
24
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

April 29, 2024

img_map_placeholder

217 S 2nd Ave, Yuma, AZ

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.