Site work and paving for a road / highway in Myrtle Beach, South Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The bid will be awarded to the lowest, qualified bidder at a Bid Award Meeting, 05.06.2024, 5pm. The Town is an Equal Opportunity Employer and reserves the right to accept or reject any and all bids for cause and to waive formalities in bidding. Construction Cost Range: $165,000 - $240,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. resurface 6850 SY roads, including prep work. Contractor will supply and place a tack coat and sufficient asphalt to resurface total square yards (sq. yd.) of paving necessary, including seal coating square yardage. of curbing on *applicable roads* before paving begins. ROAD LENGTH: South Gate Road (Hwy 17 entrance to Patterson Drive) = 2799' ROAD WIDTH: 21' divided road with median (approximately 10' width) TOTAY SY: 6850 SY (including median cuts) Note: This is an estimate; please verify before bid 1. ITEM NO. DESCRIPTION QTY. UNIT 1 Clip Shoulders 11196 LF 2 1-2" Milling 6850 SY 3 6" FDP w/ SCDOTIntermediate C 100 SY 4 1.5" SCDOT Surface C Overlay (175 lbs/sy 600 TNS 5 Back up Shoulders w/import fill 11196 LF 2. Bituminous Tack Coat: The bituminous material shall be asphaltic cement or emulsified asphalt. Acceptable emulsified asphalts shall be among the following: RS-1, MS-2, HFMS-1, SS-1, CDS-1, or CSS-2. The bituminous tack coat shall be applied at a minimum of 0.1 gallons per sq. yd. 3. Asphaltic Concrete: The asphaltic concrete surfacing shall be constructed in accordance with Section 400 of the South Carolina Highway Department Standard Specification for Highway Construction. The asphaltic concrete shall be sand asphalt for leveling and Type III of topping. 4. Thickness: Cover existing pavement with a minimum of 1.5in. in thickness. If contractor fails to meet the thickness specifications, they will be required to resurface the immediate area, maintaining the same slope for water to drain. 5. If additional preparation is required and not covered in the contract, the Contractor must write a change order and have it approved by Dave Buonviri before work is resumed. The area for each portion of the project will be verified by the contractor and differences resolved before work on that portion begins. 6. Road preparation/repairs needed before resurfacing: a. Paving will be done in weather conditions recommended by the Asphalt Institute: temperature is to be at least 50 degrees and rising for re-surfacing. b. Any required repairs to roads will be completed by others before resurfacing begins. c. Soil and grass shall be scraped from the shoulder of the roads and the road surface shall be power-broom cleaned before resurfacing

Award

Roads / Highways

$148,147.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
74
Bidding Soon
927
All Active Projects
401
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 15, 2024

May 15, 2024

img_map_placeholder

Multiple Locations, Myrtle Beach, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.