BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pleasant Hill, Missouri. Completed plans call for site work for a water / sewer project.

Separate sealed bids for the construction of Timber Street Pump Station Improvements Bid Bond, Performance and Payment Bond The owner reserves the right to waiver any informalities or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Copies of the Contract Documents, Drawings, and other related Contract information may be viewed & ordered online at http://planroom.adsmo.net/ or by contacting American Document Solutions 1400 Forum Blvd Suite 7A Columbia, MO 65203, phone (573) 446 7768 fax (573) 355 5433, email orders@adsmo.net for $ 80.00 for each set, which is a non refundable deposit. Checks should be made payable to ADS Shipping and Handling costs will be determined at the time of purchase. The work to be completed consists of improvements to the existing including Timber Pump Station, pumps, piping, controls, finished water distribution mains, valves, , hydrants, electrical, telemetry, and appurtenances. Incidental items such as excavation, demolition, paint, concrete, placement, paving/resurfacing, start up, testing, insurance, and all other appurtenances shall be provided for a complete and functional final product. The project will be bid on a Lump Sum basis except where unit pricing is requested in the bid documents. Additional information will be required prior to issuance of a change order for extra allowances If you fail to fully complete the work, the Owner will be entitled to assess liquidated damages the sum of $ 350.00 for each consecutive calendar day thereafter the indicated date of completion. The Contractor will commence the work required by the Contract Documents within 15 calendar days after the date of the Notice to Proceed and will complete the same by 270 days, unless the period for completion is extended otherwise by the Contract Documents. The Contractor further agrees to pay liquidated damages, the sum of $350.00 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions. 4. The Contractor agrees to perform all of the work described in the Contract Documents and comply with the terms therein for the sum of (in words and figures)

Bid Results

Water / Sewer

$659,601.00

Public - City

Site Work

10

23

2

8

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
27
Bidding Soon
663
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

May 22, 2024

img_map_placeholder

Timber St, Pleasant Hill, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.