EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a municipal facility in Young, Arizona. Design plans call for site work for a municipal facility.

As of March 24, 2025, an architect has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The City of Tempe is inviting your firm to submit a Statement of Qualifications for providing Professional Services for Gateway Signage-Downtown Tempe. The Consultant will be selected through a qualifications-based selection process. Please direct any questions to the City of Tempe Engineering Division, at consultant_support@tempe.gov. All written questions submitted no later than April 2, 2024, by 4:00 p.m., Arizona time The city is seeking creative design examples from the proposing firms that will incorporate the following base-level design requirements for the gateway signs: The sign shall be attractive and exhibit a professional quality, which will reflect positively on the City of Tempe. The City's name shall be incorporated in a visually appealing way into the sign and be predominantly displayed on the face of the signs. Signage shall incorporate City of Tempe's branding standards, as appropriate. Signage shall leverage the spatial organization of the location where it will be installed and utilize architectural design features, shape, color, lighting, etc. Historic properties and new contemporary architecture define Mill Avenue and shall be considered in the design to compliment these adjacent structures. Signage and imagery shall be easy to recognize, clear, distinctive, and easy to read. Signage shall be compliant with ADA Standards for Accessible Design. Signage shall be compliant with all City of Tempe sign ordinances. The City of Tempe reserves the right to accept or reject any or all SOQs, to waive any informality or irregularity in any SOQ received, and to be the sole judge of the merits of the respective SOQs received. The method of Contractor Selection has not been Determined at this time.

Design

Municipal

$2,000,000.00

Public - City

Site Work

171

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Unit Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
19
Bidding Soon
652
All Active Projects
276
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

img_map_placeholder

Multiple Locations, Young, AZ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Gateway Signage-Downtown Tempe

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.