BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in North Franklin Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; road / highway; and water / sewer project.

Concrete Patching, Dowel Retrofit, Full Depth Corner Repair, Spall Repair, Drainage, Earth Mounds, Its, Bridges, Signing, Delineation, and Guide Rail on a 4 Lane Roadway. And Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 79 Section 19r, in Washington County, Chartiers & S. Strabane Townships From Approximately the Sr 70 West Wheeling Interchange (#38) at Segment 0378 Offset 1230 Nb / Segment 0379 Offset 1728 Sb Approximately 2.5 Miles North to the Race Track Road Interchange (#41) at Segment 0404 Offset 0270 Nb / Segment 0405 Offset 0150 Sb. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 4.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Concrete Pavement Rehabilitation Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - I-79: North Junction to Race Track Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/ Group ID: 79/19R/I-79: North Junction to PA 519 The description and location of the project is as follows, concrete patching, dowel retrofit, full depth corner repair, spall repair, drainage, earth mounds, ITS, bridges, signing, delineation, and guide rail on a 4 lane roadway. and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 79 SECTION 19R, in WASHINGTON COUNTY, Chartiers & S. Strabane TOWNSHIPS from approximately the SR 70 West Wheeling Interchange (#38) at segment 0378 offset 1230 NB / segment 0379 offset 1728 SB approximately 2.5 miles north to the Race Track Road Interchange (#41) at segment 0404 offset 0270 NB / segment 0405 offset 0150 SB.

Award

Roads / Highways

$4,967,024.00

Public - State/Provincial

Paving, Site Work

139

13

12

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
149
Bidding Soon
2,056
All Active Projects
919
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

June 10, 2024

img_map_placeholder

I-79, North Franklin Township, PA

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.