EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Altoona, Pennsylvania. Working plans call for site work for a water / sewer project.

Questions Due Date: Mar 22nd 2024, 12:00 PM EDT Either an original Certified Check, Official Check, Cashier's Check or Bid Bond drawn to the order of the "City of Altoona" equal to ten (10%) percent of the amount of the bid must be submitted with the proposal. Bidders are advised that the Bid Bond must be in effect for a period of sixty (60) days from the bid opening date. Mayor and City Council reserve the right to reject any or all bids and waive any informality not material to the bid and to award the contract as may be deemed to the best interest of the City of Altoona. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Work performed on this project will be subject to prevailing wage rates as established by the Pennsylvania Department of Labor and Industry. The Contractor agrees to begin work within ten (10) consecutive calendar days from the date of the Notice to Proceed and to complete the entire contract within SIXTY (60) consecutive calendar days from the date of Notice to Proceed. No in-stream work may be performed between October 1 through April 1. It is agreed that if the contract is not completed as specified, liquidated damages shall be Two Hundred ($200.00) Dollars per calendar day. This project is being rejected and will be rebid in the near future.

Final Planning

Water / Sewer

$600,000.00

Public - City

Site Work

22

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Retaining Walls, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
64
Bidding Soon
541
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

November 1, 2024

img_map_placeholder

To Be Determined, Altoona, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Spring Run Stream Restoration

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.