BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in West Bend, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Contractor Shall Perform Everything Required To Be Performed And Shall Provide And Furnish All The Labor, Supervision, Materials, Equipment, Necessary Tools, Expendable Equipment, Supplies, Insurance Required By The Specifications, Contributions To Social Security And All Utility And Transportation Services Required To Perform And Complete In A Workmanlike Manner The Following Work Contract 24-03, Butternut Street Reconstruction Maplewynde Road Reconstruction In Connection With The Construction Of A Project Of The Owner, All In Strict Accordance With The Specifications And Drawings, And In Strict Compliance With The Contractor's Proposal And Other Contract Documents Herein Mentioned As Component Parts Of This Contract. The Contractor Shall Do Everything Required By This Contract And Other Documents Constituting A Part Hereof, And In The Manner Specified Herein. Award of the contract is tentatively scheduled for April 15, 2024 All questions regarding the project shall be directed to Brad Jors, P.E. of Kapur and Associates, Inc. at bjors@kapurinc.com or (414) 751-7235. Furnish and Install 8-Inch PVC Sanitary Sewer 960 LF Furnish and Install 8-Inch PVC Water Main 1,120 LF Furnish and Install 24-Inchx38-Inch Elliptical RCP Storm Sewer 240 LF Furnish and Install RCP Storm Sewer (12-inch to 36-Inch) 950 LF Furnish and Place 24-Inch Concrete Curb and Gutter 2,700 LF Furnish and Place 4-Inch Concrete Sidewalk 3,000 SF Paint Pavement Marking - 4-Inch Yellow 880 LF Furnish and Place Base Aggregate Dense, 1-1/4-Inch, 4-Inch Depth 2,300 TON Furnish and Place Base Aggregate Dense, 3-Inch, 8-Inch Depth 2,600 TON Furnish and Place 5-Inch Hot Mix Asphalt Pavement 1,550 TON Furnish and Place Topsoil, Seed, Fertilizer, Mulch, and Water, 6-Inch 2,700 SY Stump Removal, 6-Inch and Above 7 EA

Award

Roads / Highways

$1,130,063.00

Public - City

Paving, Site Work

33

7

2

8

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
51
Bidding Soon
834
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 15, 2024

img_map_placeholder

Multiple Locations, West Bend, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.