Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a water / sewer project in Rapho Township, Pennsylvania. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.
Bids must be on the forms furnished by the Owner. No bid will be considered unless it is accompanied by a certified check or bid bond in an amount not less than ten percent (10%) of the bid total. Such bid security shall be made payable to the Warwick Township Municipal Authority. All bid bonds shall be in the form included within the Bidding Documents and shall be accompanied by a power of attorney from a licensed surety company as described in the Bidding Documents. Bidders are advised that each bidder is required to submit with their bid a Non-Collusion Affidavit in the form contained in the Bidding Documents in accordance with the Pennsylvania Anti-Bid Rigging Act. Bidders are advised that each bidder is required to complete and submit with their Bid a Construction Contractor's Qualification Statement for Engineered Construction in the form contained in the Bidding Documents. Contracts for work under this bid will obligate the contractor and subcontractors not to discriminate in employment practices, and Bidder is required to complete and submit with their bid a Certification of Bidder Regarding Equal Employment Opportunity in the form contained in the Bidding Documents. Notice is given that the project for which bids are being solicited hereby is a project constituting public works and is subject to applicable provisions of the Pennsylvania Prevailing Wage Act, the Act of August 15, 1961, P.L. 987, as amended and supplemented, and appropriate prevailing minimum wage rates ad promulgated under the provisions of said Act must be paid by contractors in connection with performance of the necessary work. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Bidders should refer to the provisions of all federal and state statutes, rules, and regulations regarding the prevention of environmental pollution and the preservation of public natural resources that affect the project, and bidders will be required to comply with all such statutes, rules, and regulations. With respect to the contract, Owner shall award the contract to the lowest responsive and responsible bidder or shall reject all bids within sixty (60) days of the date of the bid opening, and no bidder may withdraw his bid before the expiration of such sixty (60) day period; provided, however, if the award of contracts is delayed by required approval of another government agency, required land acquisition, the sale of bonds, or the award of a grant or grants, the Owner shall reject all bids or award the contract to the lowest responsive and responsible bidder within one hundred twenty (120) days of the date of bid opening, and in such event no Bidder may withdraw his bid before the expiration of such one hundred twenty (120) day period. Extensions of the date for the award of the contract may be made by the mutual written consent of the Owner and the lowest responsive and responsible bidder. The Owner reserves the right, at its option, to waive any informalities, irregularities, defects, errors, or omissions in any or all proposals and to reject any or all proposals. Contract No. 1 generally consists of the construction of a new 1.0-million-gallon AWWA D110 style water storage tank, precast meter vault, water main, general site restoration, and pavement restoration. Contract No. 2 generally consists of the construction of a new electrical service and meter base, power and control raceway wiring, panels, switches, miscellaneous electrical devices, wiring, instrumentation, and lighting. Deadline to submit Questions Apr 2nd 2024, 4:00 PM EDT
Bid Results
Water / Sewer
$2,764,260.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2024
June 10, 2024
Newport Rd, Rapho Township, PA
Related To This Project
Rapho Township, PA
Bid Date: Apr 09 2024
Rapho Township, PA
--
Rapho Township, PA
Bid Date: May 30 2024
Rapho Township, PA
Bid Date: Oct 31 2024
Rapho Township, PA
Bid Date: Feb 23 2022
Rapho Township, PA
Bid Date: May 25 2023
Rapho Township, PA
--
Rapho Township, PA
Bid Date: Nov 19 2021
Rapho Township, PA
Bid Date: Aug 04 2022
Rapho Township, PA
Bid Date: Apr 06 2022
Girard, PA
Bid Date: Apr 12 2024
Barnesville, PA
Bid Date: Apr 18 2024
Erie, PA
Bid Date: Apr 18 2024
Alburtis, PA
Bid Date: Apr 18 2024
Packer Township, PA
Bid Date: Apr 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.