Published January 12, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Rapho Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Requests for clarification are due Monday, November 15, 2021 1:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)] For Fruitville Pike Improvement Project The Project includes the reconstruction of Fruitville Pike with milling and overlay, full depth pavement, Traffic Signals, drainage work, sanitary sewer, sidewalk, ADA ramps, bituminous curb, and all other related roadway construction. The bid will be for furnishing all labor, materials, supervision, and services associated with the Fruitville Pike Improvements Project. Each bid shall be accompanied by a bidder's bond, certified check or cashier's check, in favor of Penn Township in the amount of not less than 10% of the total amount of the bid. The successful bidder shall be bound to furnish and pay for a Performance Bond and a Labor & Material Payment Bond in an amount equal to one hundred percent (100%) of the contract price, on bond forms provided by Penn Township. All bidders must be PennDOT pre-qualified and must complete the non-collusion affidavit contained within the bidding and contract documents. This contract is in accordance with the Pennsylvania Prevailing Wage Act, and the successful bidder shall pay no less than the PA Prevailing Wage Rates determined for the project as stated in the Contract documents. There is a zero percent (0%) requirement for MBE and/or WBE participation. Award of the Contract, if the contract is awarded, will be to the lowest responsible bidder, however Penn Township reserves the right to reject any and or all bids on any basis and to waive any informality in the bidding, as permitted by law. No bidder may withdraw a bid after the actual date of the opening thereof. Contractor agrees to furnish any and all labor, superintendence, materials, necessary equipment, and other utilities and facilities for, perform all work necessary for or incidental to, and perform all other obligations imposed by this Agreement, for the completion of all Work as specified or indicated in the Contract Documents. The Contract Documents comprise the entire Agreement between Owner and Contractor and are incorporated in this Agreement and made a part hereof. The Project includes the reconstruction of Fruitville Pike with milling and overlay, full depth pavement, drainage work, sidewalk, ADA ramps, bituminous curb, and all other related roadway construction

Award

Roads / Highways

$1,432,865.00

Public - City

Paving, Site Work

40

20

74

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
148
Bidding Soon
2,063
All Active Projects
976
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2021

March 1, 2022

img_map_placeholder

Fruitville Pike, Rapho Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fruitville Pike Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.