Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Hornick, Iowa. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.
Work will include Class 10 roadway and borrow excavation, aggregate roadway cover, granular shoulders, binder bitumen, culvert and intakes, manhole adjustments, driveway remove and replace, valve box replacement, mulching, seeding and fertilizing, and other related construction work including cleanup. Project bids in two divisions. Division 1 will be removal and replacement of selected roadway on the eastern side of the City and construction of a ditch along the roadway. Division 2 will be selected patches of roadway on the western side of the City. East and west sides of the City are delineated by Main Street. Site Directions: Located in the City of Hornick, Iowa. Work shall be completed by November 1, 2024. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City of Hornick, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in an amount equal to five percent (5%) of the amount of the proposal and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the specifications contract documents with corporate surety satisfactory to the City of Hornick. The bid shall contain no condition except as provided in the specifications. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by the City of Hornick and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Hornick from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. The guaranteed maintenance period for new paving (if applicable) shall be four years The Certified Check, Certified Share Draft or Cashier's Check may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the bidder fails to execute a contract or file acceptable performance bonds or provide an acceptable certificate of insurance within ten(10) days after the acceptance of their proposal by resolution of the City. Contractor shall fully complete the project no later than November 1, 2024. Should the contractor fail to complete the work in this timeframe, liquidated damages of $500.00 per day shall be assessed for each calendar day that work proceeds on the project beyond the specified completion date, excepting authorized extensions thereof. Contractor shall put forth a consistent effort to continually move the project forward. While it is understood that weather delays are unavoidable, contractor's absence beyond these times shall not be acceptable. The City of Hornick reserves the right to defer acceptance of any bid for a period of sixty (60) calendar days after receipt of bids and no bid may be withdrawn during this period.
Bid Results
Roads / Highways
$2,388,729.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2024
June 11, 2024
Multiple Locations, Hornick, IA
Related To This Project
Hornick, IA
--
Hornick, IA
Bid Date: Aug 23 2022
Hornick, IA
Bid Date: Apr 27 2022
Hornick, IA
Bid Date: Apr 27 2022
Hornick, IA
Bid Date: Mar 11 2022
Cherokee, IA
Bid Date: Apr 15 2024
Burlington, IA
Bid Date: Apr 02 2024
Cedar Falls, IA
Bid Date: Apr 11 2024
Marion, IA
Bid Date: Apr 09 2024
Ames, IA
Bid Date: May 30 2024
Decorah, IA
Bid Date: Apr 30 2024
Melbourne, IA
Bid Date: May 01 2024
Onawa, IA
Bid Date: Apr 12 2024
Waterloo, IA
Bid Date: Apr 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.