BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Davie, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Counties: Broward CONTRACT NO.: CAE71 Road Name: SW 45TH ST/ORANGE DR AND TAFT ST Limits: From Florida's Turnpike to SR 7 (US 441) and From SR 7 (US 441 to N 40th Ave) Project(s): 42957695201(*) Federal Aid No: D424008B Project(s): 42957695202 Federal Aid No: N/A Total Roadway Length: 1.911 Miles Contract Days: 244 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.911 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Description: The Improvements under this Contract consist of The intent of this project is to enhance the transit passenger, bicycle and pedestrian experience through mobility and safety improvements along Orange Drive and Taft Street. The project limits are along Orange Drive with the Town of Davie from Florida's Turnpike to SR 7 / US 441 and Taft Street within the City of Hollywood from SR 7 / US 441 to N 40th Avenue. Along Orange drive this project will add a 5' wide concrete sidewalk along the north side of the road and the existing drainage swales on the north side of the road will be regraded. Along Taft Street, the existing 5' sidewalk on the north side of the road will be replaced with a 9'-11' wide shared use path. Curb and gutters will be added where necessary and Taft Street will be milled and resurfaced from SR 7 / US 441 to N 59th Court and also at intersections where the pavement widths are changed to accommodate the proposed shared use path. Existing utility and light poles adjacent to the north side of the road will be relocated to the back of the proposed shared use path. Driveway and drainage impact due to the addition of the shared use path will also be addressed. Question Deadline 04/17/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 008: Bike Lane / Sidewalk / Drainage Improvements / Milling and Resurfacing - SW 45Th.

Award

Roads / Highways

$3,298,227.00

Public - State/Provincial

Paving, Site Work

288

5

2

4

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
50
Bidding Soon
1,098
All Active Projects
495
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.