BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2024 at 8:00 PM

Updated April 20, 2024

Site work and paving for a sidewalk / parking lot in Basalt, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000346995 The Town of Basalt (Town) is accepting proposals from qualified firms and contractors for the removal and replacement of two sections of sidewalk for the 2024 Concrete Sidewalk Repairs Project. Question Deadline 04/12/2024 at 3:00 PM MT Questions are submitted online No, Questions may be submitted directly to Matt Wagner at 970-279-4469 or by email at matt.wagner@basalt.net. Questions received, answers and other clarifications will be distributed to all proposers via email Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % The Town reserves the right to Reject any and all proposals received as a result of this RFP. As part of the Public Works Sidewalk Concrete Replacement Project the Town is seeking to retain the services of a firm or contractor to provide: A. Excavation, removal, and haul off existing concrete. B. Form and pour new sidewalk using a class D CDOT specification mix with fiber mesh added. C. Provide signage, detours, and traffic control during the project to meet all Town of Basalt Specifications. One section of sidewalk on Willits Lane does not have a sidewalk on the other side of the roadway so a specific plan on how to get those pedestrians safely around the project will need to be shown and drawn out in the traffic control plan. The areas to be addressed are pictured in the attached Exhibit A. A schedule for design will be discussed and negotiated with the firm selected for the project. The sidewalk repairs to be addressed as part of this project are pictured in the attached Exhibit A. The Town assumes that the project will involve three steps, the first step will be the setup of traffic control and pedestrian safety routes, as outlined below. Task 1. Setup appropriate Traffic control and pedestrian safe routes prior to start of work. Task 2. Remove and haul off existing damaged concrete sections. Task 3. Replace Concrete with CDOT and Town of Basalt Approved Concrete Specs

Post-Bid

Sidewalks / Parking Lot

$550,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
21
Bidding Soon
169
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

Project location map

Multiple Locations, Basalt, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.