BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in New Buffalo, Michigan. Completed plans call for site work for a water / sewer project.

The work for which bids are being requested consists of the following: Water meter replacements. Water service inspections consisting of the following: Complete two exterior verifications at each property according EGLE guidelines and the project specifications, including identification of material type and completion of a Survey123 electronic questionnaire and photos of each verification. Includes notifying property owners of verification work to be completed on private property as specified herein. If necessary, complete one (1) interior verification at each property according EGLE guidelines and the project specifications, including identification of material type and completion of a Survey123 electronic questionnaire and photos of each verification. Includes coordinating and scheduling interior inspection with property owner. Most (if not all) interior inspections are planned to be completed by the Owner. A miscellaneous quantity of interior inspections has been included in this Contract in the case unforeseen circumstances arise and the Owner cannot complete all the necessary interior inspections. This project entails examination of existing plumbing and therefore the Contractor will not be considered a formal "Plumbing Inspector." Proof of Master Plumber license will not be necessary to complete this work. A certified check or bank draft drawn on a solvent bank in the State of Michigan payable without condition to the OWNER, or a satisfactory bid bond executed by the bidder and a surety company, in an amount equal to 5 percent of the bid shall be submitted with each bid. Neither the OWNER nor the ENGINEER will be responsible for partial sets of documents obtained from any other source. The Advertisement for Bids, Plan Holder's List, all Addenda, and the Bid Tabulation will also be posted on the Wightman website No bids may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days to allow for the review of proposals and to allow completion of necessary financial arrangements. The successful bidder will be required to furnish a satisfactory Performance Bond in the amount of 100 percent of the Contract price. Bond forms are included in the Contract Documents.

Post-Bid

Water / Sewer

$250,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
115
Bidding Soon
1,631
All Active Projects
732
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

June 10, 2024

img_map_placeholder

Multiple Locations, New Buffalo, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.