BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Patuxent River, Maryland. Completed plans call for the renovation of a military facility.

This project includes the disposal of two deteriorated 7.5 tons HVAC systems to include air handling units and associated accessories, and mini-split type unit and associated accessories. New work includes installation of new single HVAC system and associated ductwork, air handling unit, housekeeping pad, and associated accessories. Install new ductless split type unit and associated accessories. All work will be accomplished in accordance with all federal, state, local, and installation codes and laws shall conform in accordance of all Federal, State, and Local Installation codes and laws, including preparation of design. NAVFAC Solicitation Number: N40080-24-R-2127 NAVFAC Project No.: 1772435 Title: B2184 Replace 2 HVAC Systems Location of the Work: NAS PAX River, MD Description of the Work: Removal and disposal of two deteriorated 7.5 tons DX split unit systems to include air handling units, ductwork system, and associated accessories at building 2184. Pre Proposal Inquiry (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries must be made in writing and shall be submitted via email to taylor.e.miner.civ@us.navy.mil no later than 2:00PM on 10 June 2024 with inquiries attached as a Excel document (no tables please) Attachment C. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment. Estimated Budget Amount or Price Range: The estimated price range for this project is $525,000.00. Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government desires completion of construction within 292 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance). Removal and disposal of two deteriorated 7.5 tons DX split unit systems to include air handling units, ductwork system, and associated accessories at building 2184

Post-Bid

Military

$525,000.00

Public - Federal

Renovation

5

17

4

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
80
Bidding Soon
1,977
All Active Projects
774
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

August 1, 2024

img_map_placeholder

NAS Paxutent River, Bldg. B2184, Patuxent River, MD

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.