BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Pacifica, California. Contact the soliciting agency for additional information.

The City of Pacifica is accepting sealed bids/proposals for Ultraviolet Disinfection System Replacement Project (P034) Construction Management Services TBD to be received no later than Thursday, April 25, 2024 at 5:00 pm. 1.2. Background The CCWRP is designed to treat an average daily dry weather design flow of 4 MGD and a peak hourly wet weather discharge capacity of 20 MGD to Calera Creek. The CCWRP employs sequencing batch reactors ("SBRs") that combine the basins for aeration and clarification, which are separate basins at conventional wastewater treatment plants. The CCWRP was one of the first fully automated plants in the San Francisco Bay Area designed for nutrient removal and helped pioneer the use of Ultraviolet (UV) disinfection for wastewater effluent in California. Furthermore, CCWRP was also one of the first plants using ATAD technology (auto thermal thermophilic aerobic digesters) for the generation of Class A sludge in California. The City provides effluent water to NCCWD, who serves it as recycled water under an existing Memorandum of Understanding ("MOU"). NCCWD previously core-drilled into the Plant's clearwell with a valve that allows it to divert flow to its wet well and pump. NCCWD then puts sodium hypochlorite residual into its recycled water and distributes that recycled water, with the primary end use being irrigation at Sharp Park Golf Course. Additional information regarding the NCCWD Recycled Water Program is available online. The Plant currently uses the Trojan UV4000, an ultraviolet ("UV") system, for disinfection. The manufacturer stopped supporting this system as of July 2022, so the City wishes to replace the UV disinfection system with an upgraded UV disinfection system. The Ultraviolet Disinfection Replacement Project (Project) was initiated in the Spring of 2022 to replace the existing system. Design was completed in March of 2024 and construction is expected to begin in the Spring of 2024. The consultant for construction management and inspection services (CM Consultant) will provide construction management and construction inspection services for the Project. Question Submission Deadline:April 12, 2024, 5:00pm

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
76
Bidding Soon
1,726
All Active Projects
727
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

August 26, 2024

img_map_placeholder

700 Pacific Coast Hwy, Pacifica, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.