BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lake Mills, Iowa. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.

2024 STREET REHABILITATION PROJECT: DIVISION 1 Project includes all labor, materials, and equipment necessary to construct PCC street patching, PCC curb & gutter repairs, ADA compliant sidewalk ramps, and miscellaneous associated work, including cleanup. Awarded & Low: Wicks Construction $195,462 2024 STREET REHABILITATION PROJECT: DIVISION 2 Project includes all labor, equipment, and materials to construct HMA overlay including pavement scarification, HMA patching, HMA level course, and approximately 14,730 SY of 2" HMA surface course, manhole adjustments, and miscellaneous associated work, including cleanup. Awarded & Low: Ulland Brothers $238,412 Each proposal shall be accompanied by a bid security in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to 5% of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of the bid. Contractor shall determine amount of bid bond based on the amount of the base bid and all alternate construction bid items. The successful bidder will be required to furnish a bond in an amount equal to one hundred (100) percent of the contract price, said bond to be issued by a responsible surety approved by the City Council and listed in the U.S. Treasury Department's most current list (Circular 570, as amended) and authorized to transact business in the State of Iowa and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the work and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period as required by the specifications after its completion and acceptance by the City Council. Division 1 is anticipated Notice to Proceed will be issued by April 29, 2024. Work for all items shall be substantially completed no later than June 28, 2024 Division 2 is anticipated Notice to Proceed will be issued by July 1, 2024. Work for all items shall be substantially completed no later than September 13, 2024. Liquidated damages in the amount of Four Hundred Dollars ($400) per calendar day will be assessed for each calendar day that work on the total project, or portions of the contract where specific completion dates are specified or otherwise agreed to, that remain substantially uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the contractor. The City reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to enter into such contract as it shall deem for the best interest of the City.

Award

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

25

10

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
30
Bidding Soon
247
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

April 29, 2024

img_map_placeholder

Multiple Locations, Lake Mills, IA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.