Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2024 at 8:00 PM

Updated May 17, 2024

Site work and paving for a civil project in Quinte West, Ontario. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

The work involves the supply of all labour, equipment, and materials for the sanitary upsizing and subsequent reconstruction work on Old Wooler Road. This includes traffic control, jack & boring and installation of steel casing pipe under existing culverts, removal and installation of sanitary trunk sewer including its services and appurtenances, the removal of the existing watermain where required and the installation of new watermain including its services and all appurtenances as noted, the removal of the existing storm sewer where required and the installation of new storm sewer and appurtenances, rock excavation, dewatering, modification of existing Sanitary Manholes for new PVC (Sanitite) pipe, full depth asphalt removal, road base excavation, supply and placement of Type II Limestone Granular A & B, hot mix asphalt paving, topsoil and sod, and structure adjustments. The work is expected to begin September 4, 2024 and be substantially complete by November 29, 2024. Documents can be obtained at: https://quintewest.bidsandtenders.ca Question Deadline 05/02/2024 at 12:00 PM ET Bid values are undisclosed

Bid Results

Water / Sewer

$500,000.00

Public - City

Paving, Site Work

7

7

6

11

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
87
Bidding Soon
1,419
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

September 4, 2024

Project location map

Wooler Rd, Quinte West, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed