BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Saint Louis, Missouri. Working plans call for the renovation of a educational facility; and library.

Valley Park School District Proposition B On April 2, 2024, the Proposition B bond vote passed. As of May 10, 2024, per owner an architect and CMAR have been identified for the district. They will begin a small portion of the construction this summer. Primarily flooring in the middle school and early childhood and some painting in those buildings. The majority of the work will be completed in Summer of 2025 and into 2026. The school district asked through Prop B to borrow $16.5 million for a no-tax-rate-increase facilities initiative at existing school sites and buildings, including safety and security upgrades, roof and HVAC system replacement, and improving classrooms, library spaces and other activity and athletic spaces. Elementary School Projects: Building System and Finishes - ES restroom upgrades Other Space Upgrade - Renovation of center learning pods Other Space Upgrade - Re-purpose special education, counseling and reading rooms Furniture Fixtures and Equipment - Update library furniture and technology Classroom Upgrade - Painting throughout (Pre-K through 12) Classroom Upgrade - Replace flooring throughout (Pre-K through 12) High School Project: Building System and Finishes - HS restroom renovations Safety and Security - HS window replacement, to include window film, sealant Classroom Upgrade - Renovation to food and home science labs CTE Upgrades - Renovation of industrial tech and art room - does NOT include addition Classroom Upgrade - Renovation of English and business classrooms for better utilization Classroom Upgrade - Science lab renovations Furniture Fixtures and Equipment - Update library furniture and technology Classroom Upgrade - Painting throughout (Pre-K through 12) Classroom Upgrade - Replace flooring throughout (Pre-K through 12)

Pre-Construction/Negotiated

Educational

$16,500,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
44
Bidding Soon
845
All Active Projects
332
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

img_map_placeholder

To Be Determined, Saint Louis, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.