BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Amherst, Massachusetts. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

**As of November 5, 2024 this project has not yet been awarded. A timeline for award has not yet been established. https://www.gazettenet.com/General-contractor-for-Amherst-elementary-school-project-57095768 AMHERST -- Construction of Amherst's new $97.5 million elementary school, to open for classes in fall 2026, will begin next month after officials received a low bid from a Waltham-based general contractor that is more than $4.8 million below the funding agreement between the town and state. With CTA Construction Managers submitting the lowest of three bids for the construction of the school itself at $73.48 million, on Thursday, the Elementary School Building Committee was informed Friday morning by the owner's project manager that a contract can likely be awarded, meaning the company will begin site work for the project, next to the current Fort River School on South East Street, early next month. "The news is good," said Margaret Wood, of Anser Advisory of Boston, the project manager. "We are under budget and it appears we have a low bidder." "This is thrilling news," said District 1 Town Councilor Cathy Schoen, who chairs the building committee. Schoen said with three viable bids, the green light can be given for constructing the 105,750-square-foot, net-zero emissions building with space for 565 K-5 students. The building, designed by DiNisco Design of Boston, will be powered by ground-source heat pumps and photovoltaic panels. "It's going to be an amazing asset for our kids, the community and the town on its energy initiatives, and hopefully we can be building on this success," Schoen said. When complete, both 1970s-era elementary schools, Wildwood and Fort River, will close, bringing an end to the buildings that use an open classroom, or open quad, format that has made classrooms noisy and limited natural light. Sixth grade students at those schools, as well as at the town's third elementary school, Crocker Farm, are supposed to relocate to a 6th Grade Academy at the Regional Middle School. The Fort River school building will be demolished to make way for playing fields and other outdoor elements that will support the new school, while the future of the Wildwood building is up in the air. The other bidders were J&J Contractors of North Billerica, which submitted a $75.01 million bid, and Fontaine Brothers Inc. of Springfield, which submitted a $75.62 million bid. The anticipated awarding of a contract continues a lengthy process to get a new elementary school that resumed after Town Meeting in 2016 failed to authorize spending for a twin school project at the Wildwood School site on Strong Street, and voters in 2017 failed to overturn that decision. After being accepted back in to the state's school building program, and with a new form of government, the Amherst Town Council approved a Proposition 2 1/2 debt-exclusion override, and then the Massachusetts School Building Authority in late April 2023 unanimously approved over $40 million to fund Amherst's project. That amount from the state has since been increased to around $50 million. In May 2023, voters passed the Proposition 2 1/2 debt-exclusion override with better than 80% support for the new school. The funding agreement with the Massachusetts School Building Authority is $81.34 million, and the work has been estimated at $76.55 million. Adding in the bid from CTA, the total committed construction costs for the project are now $76.5 million, which includes $2.25 million for early construction work done by Gagliarducci Construction, purchase of electrical equipment and other assorted expenses. Wood said if there are bid savings, MSBA will notify the town. Then, the standard practice is usually to place that savings in a contingency account, adding to the $4.6 million currently available for contingencies. Kseniya Slavksy, also of Anser Advisory, elaborated. "The good news is because the overall package came in at a lovely savings ... that leaves a larger contingency at the end," Slavsky said. The total project costs includes various soft costs, furniture and technology for building and site work, along with the expenses for the architect and the owner's project manager. Before the contract is awarded, CTA will have to provide minority- and women-owned business participation documents, Slavsky said. Building committee members had some questions about the bids and the project. Bruce Coldham wondered if the $2.2 million bid spread between the three bids was unusual and whether there was anything to learn from it. Wood said it indicates the design documents were very good and there was no big discrepancy, and she praised DiNisco for its work on the project. Rick Rice, a principal at DiNisco, said CTA's low bid may have been due to market conditions, and there is no evidence of any mathematical errors. "I think CTA was very aggressively trying to establish a foothold in the western part of the state," Rice said. Committee member Jonathan Salvon, an owner of Kuhn Riddle Architects, said it was a nice cluster of bids and that he didn't see the spread as being too large. Wood said she has confidence in CTA, which has a substantial body of completed elementary school projects. Others have worked with them. Rice pointed to having a good experience with CTA working on a K-5 school in Woburn and an early childhood center in Lexington. In addition, Tim Cooper, a senior associate at DiNisco, worked with CTA on a school in Swampscott. "They're capable of the task at hand," Cooper said. Another question from building committee members was whether CTA would be able to meet the June 2026 deadline for substantial completion of the building, after the bid deadline was pushed back a month in response to questions from bidders. Rice said the site is shovel-ready and he doesn't foresee any challenges for the company, which has worked on more difficult sites. Slavsky said if necessary, CTA could use acceleration tactics, such as having workers on overtime and doing weekend work. Slavksy said these would likely have been considered by the company in submitting its bid. "If there were mitigation strategies that the bidders needed to apply to get to the date required, they have already factored them in," Slavsky said. _____________________ General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work -- General Building Construction and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime Update Statement The new Fort River Elementary School project, at 70 S. East St, will replace the existing school. The new school will be constructed on the field south of the existing school for 575 K-5 students in a new three-story, steel frame,105,750 GSF Net Zero building. The existing school will remain active during construction. Contract work includes photovoltaic panels and a ground source heat pump HVAC system. Soil improvements are being performed under a separate contact and are scheduled to be substantially completed before the start of construction under this contract. Estimated Cost $78,000,000 Bids subject to M.G.L. c. 149. The Project consists of but not limited to: A new elementary school building to replace the existing Fort River and Wildwood school on the existing Fort River school site, which will remain in operation during the construction. Upon occupancy of the new building, the existing Fort River school shall be demolished and the site work completed. The work is estimated to cost $76,548,643.00 All bidding Requests for Information (RFIs) shall be submitted online by 08/07/2024 at 2:00PM EDT for general bids. VBE/SDVOBE - 3.0% of the Total Project Price

Bid Results

Educational

$73,475,000.00

Public - City

New Construction, Site Work

512

38

160

10

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
402
Active Projects
184
Bidding Soon
3,422
All Active Projects
1,427
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

October 21, 2024

img_map_placeholder

70 S East St, Amherst, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.