BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Hays, Kansas. Contact the soliciting agency for additional information.

Fort Hays State University seeks proposals from qualified testing agencies to perform special testing and inspections on the Bickle Schmidt Athletic Complex project. This project consists of one new 20,000 GSF structure. The new construction is a steel frame building. Foundation system for the new building is spread footings and foundation walls. Structural system is steel frame with metal deck and concrete floor. Roof framing is also steel framing with metal deck. This project is expected to mobilize in late April 2024, with project completion scheduled for late 2025. The general contractor for the project is Paul-Wertenberger Construction Inc., PO Box 1311, Hays, KS 67601. Contact person is Matt Allen, 785-625-8220. Design team members are listed in the project manual. Project documents are currently available on-line at the State of Kansas Department of Design Construction and Compliance web site. Areas of testing include: A. Cast-in-place concrete B. Unit masonry C. Structural steel framing D. Steel decking E. Cold-formed metal framing F. Grading G. Concrete paving

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
47
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

img_map_placeholder

1376 US-183 BYP, Hays, KS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.