BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Renovation of a fire / police facility in Bowling Green, Kentucky. Completed plans call for the renovation of a 36,000-square-foot fire / police facility.

As of December 11, 2025, construction began in mid-late 2023 and was completed in Spring 2025. The design for this project includes reconstructing a new fire station and a public safety training facility for both the Police and Fire Departments. Architectural services started in FY2022 with an initial budgeted amount of $300,000 and another $240,000 was budgeted in FY2023 with an additional $180,000 added mid-FY2023, for a total of $720,000 including design for the new Transpark Fire Station. The bid for construction came in at just over $16 million. The FY2023 original budget was approximately $5.4 million for the reconstruction of the Northside Fire Station and $10.4 million for the expanded Public Safety Training Center (PSTC), with another $200,000 for utility relocation (actual cost was $86,000), and the grading and paving of access roads and training track of approximately $100,000. Additional funds have also been included for any miscellaneous costs incurred during construction, for a total original budget of $16,950,000. Following adoption of the FY2024 budget, a change order in the amount of $707,653 was approved to change the foundation of the station and the training center to a micropile foundation bringing the total construction cost to $16,708,963. Construction on this project began in June 2023 and is expected to take 18-24 months. The FY2025 budget includes IT equipment such as networking equipment, computers, phones, etc., the furnishings and equipment to furnish the PSTC portion, and furnishings for the Northside Fire Station side of the facility. Cabling for the PSTC and Northside Fire Station was bid out in June 2024 and came in at $165,452. Out-year expenses include constructing a pavilion and streetscaping.

Occupancy

Fire / Police

$16,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2023

Project location map

250 Porter Pike, Bowling Green, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.