BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a water / sewer project in Fresno, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The scope of work includes but is not limited to; the dewatering and cleaning of two digesters, and rehabilitation of one digester at the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF). The scope of work for the cleaning is part of a rotating maintenance program that was established to improve efficiencies. Digesters #2 (75 foot diameter) and #9 (105 foot diameter) will contain approximately 13 feet of accumulated solids consisting of sludge, sand and other debris normally found in wastewater digesters. The work under this contract is to furnish any and all necessary labor, materials and equipment for the removal of access hatches and cleaning of the digester, this generally includes but is not limited to screening of pumped digester sludge (capable of removing particles 1/4 inch and larger), a dewatering process to remove water from the screened sludge resulting in a minimum of 20% bio solids by weight, and transferred to a designated staging area (the fluid separated during dewatering process will be deposited into a plant drain).Then, after the digester is emptied, any solids on the digester ceiling, walls, floors and equipment must be water blasted until clean as shown on the plans and specified herein. The scope of work for rehabilitation consists of coating of wall surfaces in Digester #9. The rehabilitation and coating is expected to include, as a minimum, removal of existing coating, a high pressure water cleaning sufficient to remove all loose concrete and concrete repair, if necessary, with an acid resistant cement or other acceptable product. The corrosion resistant protective coating shall be a spray on elastomeric polyurethane protective coating product. The intent is to allow the Bidder to install a coating system, concrete repair system, top coating, etc. to ensure a 20 year product life when installed in a wastewater environment. All materials shall be suitable for use with ambient air conditions containing H2S in a Wastewater Treatment Plant enclosed environment. The City reserves the right to reject any and all bids. Services of an interpreter and additional accommodations can be made available. Requests for accommodations should be made at least five working days but no later than 48 hours prior to the scheduled meeting/event. Please contact the Procurement Specialist on the cover at 559-621- 1332 or through the Questions and Answers field on Planet Bids. In accordance with provisions of section 22300 of the California Public Contract Code, Contractor may substitute securities for any monies withheld by City to ensure performance under the Contract. A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work. Bidders are advised that, as required by the Fresno Municipal Code, the city has established a National Targeted Worker mandatory participation level. Bidders are advised that as required by the Fresno Municipal Code, the City of Fresno is implementing new National Targeted Worker requirements for public work of improvement contracts over $200,000. The mandatory participation level for National Targeted Workers is 15%. No bid will be considered for award unless the Bidder at the time of bid opening, is licensed with a valid Class "A" Contractor's License issued by the State of California. The Construction Allocation for this project is $1,200,000. Bid Valid 64 Days from Bid Opening Date Liquidated Damages $500 per day for each calendar day. Start/Delivery Date Date of Notice to Proceed Project Duration 100 Working days from Notice to Proceed

Award

Water / Sewer

$1,135,915.00

Public - City

Renovation, Site Work

7

7

2

8

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
28
Bidding Soon
403
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

June 24, 2024

img_map_placeholder

5607 W Jensen Ave, Fresno, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.