BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Concord, California. Contact the soliciting agency for additional information.

Questions concerning the BFCP should be directed to Wesley Mercado at wmercado@ccwater.com or (925) 688-8129 Contra Costa Water District (CCWD) requests Proposals from firms interested in providing professional services for the Building Facilities Comprehensive Plan (BFCP). The BFCP tasks described in the Project Description below and in Attachment 4 shall be completed by June 30, 2025. BACKGROUND The purpose of this project is to identify and prioritize the renewal and replacement needs of CCWD's buildings, facilities, and grounds that primarily serve administration and operational support for CCWD and staff. A comprehensive plan for these buildings and facilities has not been completed since 1999 and CCWD desires to complete a more thorough evaluation to identify capital improvements. Capital improvements identified shall be prioritized for incorporation into CCWD's Ten-Year Capital Improvement Program (CIP). PROJECT DESCRIPTION The key objective of the BFCP project is to deliver a report on recommendations of prioritized capital projects to include in CCWD's 10-year CIP. The BFCP will be developed in a manner similar to CCWD's other recent master plans and studies; specifically, it will define and follow a risk-based methodology tailored to existing assets that comprise CCWD's building facilities and grounds. An asset register will be developed to provide data for a risk assessment which will be used to support the identification of improvement needs. Mechanical, electrical, structural, and civil assets will be included such as roofing systems, HVAC, fire suppression, plumbing, lighting, power, pavement, fencing, and security. Additionally, visual assessments will be conducted to support the development of recommendations to address known issues, including differential settlement at one building. In addition, the BFCP will assess CCWD's administrative capacity and space needs to identify existing deficiencies and future needs. It is anticipated this project will be a collaborative effort with CCWD staff and the Consultant, and will include a needs assessment, occupancy planning, and initial space planning. This effort shall also incorporate the needs identified from CCWD's Advanced Clean Fleet Plan to support CCWD's approach to fleet electrification. The major elements for the 2024 BFCP for the Consultant to provide include the following: o Assist with developing an asset hierarchy for organizing the asset register; o Define a risk assessment methodology including risk factors, scoring rubrics, and a risk matrix with defined risk categories based on Likelihood of Failure and Consequence of Failure; o Perform visual assessments including the Engineering Building at 2411 Bisso Lane; o Support an administrative capacity needs assessment, complete occupancy planning and initial space planning with near-term needs identified; o Incorporate findings from the fleet electrification plan and provide recommendations; o Identify improvement projects and planning-level cost estimates; o Document the approach, findings, and recommendations in a project report

Conceptual

Municipal

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
371
Active Projects
182
Bidding Soon
3,410
All Active Projects
1,374
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 24, 2024

June 30, 2025

img_map_placeholder

Multiple Locations, Concord, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.