Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 18, 2026 at 8:00 PM
Updated September 14, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Butler, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
This project is for the bridge preservation activities to the existing structure carrying SR 356 over the B&P, B&LE Railroads and Connoquenessing Creek also included is the addition of repairs for a bridge hit and to place a carbon fiber wrap on the existing structure carrying I-79 over T-348 (East Lancaster Road) and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 356, SECTION 254, in Butler COUNTY Butler CITY and Lancaster TOWNSHIP from approximately the start of the existing structure at segment 0410 offset 0000 to approximately the end of the existing structure at segment 0410 offset 1048. Project Cost Range: $200,000.00 - $499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 8.00% Let Type: Scheduled Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Reconstruction 408 Version: 2026-IE Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - Wayne Street Viaduct Epoxy *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All requests, questions, and submittals shall be submitted in writing directly to Rich Pavetto (Richard.pavetto@gwrr.com)
Bid Results
$293,182.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2026
September 28, 2026
W Wayne St, Butler, PA
Related To This Project
Butler, PA
Bid Date: Jul 24 2026
Butler, PA
--
Butler, PA
Bid Date: Aug 05 2026
Butler, PA
Bid Date: Aug 18 2026
Butler, PA
Bid Date: Aug 12 2026
Butler, PA
Bid Date: Sep 21 2026
Butler, PA
Bid Date: Aug 31 2026
Butler, PA
Bid Date: Sep 02 2026
Butler, PA
--
Butler, PA
--
Butler, PA
--
Butler, PA
Bid Date: Jul 08 2026
Butler, PA
Bid Date: May 29 2026
Butler, PA
Bid Date: Jun 09 2026
Butler, PA
Bid Date: Apr 27 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed