Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2024 at 8:00 PM

Updated April 30, 2024

Site work for a water / sewer project in Holladay Cottonwood, Utah. Working plans call for site work for a water / sewer project.

**As of April 29, 2024, bids were canceled. No definite date for the rebid.** This courtesy posting is an advertisement of a procurement opportunity for City of Holladay, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor's response will still be evaluated by City of Holladayas described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. Questions: All communication relative to the Project shall be directed to the ENGINEER prior to opening of bids at: HANSEN, ALLEN & LUCE, INC. Attn: Kayson Shurtz, P.E. Email: kshurtz@halengineers.com. All questions to be submitted by 5:00 p.m. April 11th, 2024. The project is described in general as: The construction of a new storm drain pipeline with a total length of 1,195-feet, including 15-inch ADS, 18-inch RCP, 24-inch RCP, 24-inch CMP, and 30-RCP. Project includes installation of manholes, catch basins, cleanout boxes, abandonment of existing storm drain systems, restoration of pavement and surface improvements in local rights-of-way, and connections to existing systems. Bidding Documents may be electronically obtained from the Utah Public Procurement Place (UP3) on or after March, 29th 2024. No paper copies of the Contract Documents will be available for purchase from the OWNER.

Final Planning

Water / Sewer

$425,000.00

Public - State/Provincial

Site Work

19

7

8

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
69
Bidding Soon
1,209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

October 29, 2024

Project location map

Cottonwood Ln, Holladay Cottonwood, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed