BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work and paving for a sidewalk / parking lot in Holladay Cottonwood, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of October 29 2025 this is complete. Questions: Email questions to Mark Stenquist, P.E., Project Engineer at mstenquist@forsgren.com. All questions to be submitted by 5:00 p.m. Monday, April 21, 2025. Questions Due Date: Apr 21st 2025, 5:00 PM MDT Bidders are invited to bid on the Construction Contract known as 2025 Curb and Gutter Repair Project. B. The location of the work is: City of Holladay Utah C. The Work generally includes, but is not limited to, the following: removing and replacing concrete curb and gutter and waterways within the City of Holladay. D. The City will select up to three (3) contractors to perform the work. E. Up to one million dollars ($1,000,000) is available for the work. The City does not guarantee any minimum amount to the selected contractors All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER vie email no later than seven (7) calendar days prior to opening of Bids. In the ENGINEER's discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Contract Documents. The WORK to be performed under this contract shall consist of furnishing all plant, tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The WORK shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the WORK in good faith shall be provided by the CONTRACTOR as though originally so indicated, at no increase in cost to the OWNER.

Occupancy

Sidewalks / Parking Lot

$1,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
73
Bidding Soon
1,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

October 8, 2025

Project location map

Multiple Locations, Holladay Cottonwood, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.