BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Holladay Cottonwood, Utah. Working plans call for site work for a water / sewer project.

**As of April 29, 2024, bids were canceled. No definite date for the rebid.** This courtesy posting is an advertisement of a procurement opportunity for City of Holladay, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor's response will still be evaluated by City of Holladayas described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. Questions: All communication relative to the Project shall be directed to the ENGINEER prior to opening of bids at: HANSEN, ALLEN & LUCE, INC. Attn: Kayson Shurtz, P.E. Email: kshurtz@halengineers.com. All questions to be submitted by 5:00 p.m. April 11th, 2024. The project is described in general as: The construction of a new storm drain pipeline with a total length of 1,195-feet, including 15-inch ADS, 18-inch RCP, 24-inch RCP, 24-inch CMP, and 30-RCP. Project includes installation of manholes, catch basins, cleanout boxes, abandonment of existing storm drain systems, restoration of pavement and surface improvements in local rights-of-way, and connections to existing systems. Bidding Documents may be electronically obtained from the Utah Public Procurement Place (UP3) on or after March, 29th 2024. No paper copies of the Contract Documents will be available for purchase from the OWNER.

Final Planning

Water / Sewer

$425,000.00

Public - State/Provincial

Site Work

19

7

8

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
550
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

October 29, 2024

img_map_placeholder

Cottonwood Ln, Holladay Cottonwood, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.