BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in North Kingstown, Rhode Island. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Rhode Island Contract No. 2024-CB-018, Federal Aid Project No. BHOBG46(001) is for Bridge Group 46_R, Repairs to Lafayette RR Bridge No. 243 in North Kingstown. This work involves repairing and painting ends of steel girders, replacing steel bearings, replacing deteriorated concrete pedestals, making concrete repairs to abutments, and maintenance and protection of traffic, complete and accepted. Vendor Q&A Start Date: March 29, 2024 at 11:15:00 AM EDT Vendor Q&A End Date: April 21, 2024 at 12:00:00 PM EDT If you have any questions, please contact: M. Scott Stephens 1 Capitol Hill 2nd Floor Providence RI, 02908 United States Tel: 401-574-8152 Fax: michael.stephens@purchasing.ri.gov A bid bond payable to the State of Rhode Island, in the amount of 5% of the total or gross sum of the bid must be furnished by each bidder, A performance bond of one hundred (100) percent of the contract price with a satisfactory surety company will be required of the successful bidder RIDOT: Bridge Group 46_R - Lafayette RR Amtrak requires that a site-specific work plan for accomplishing hoisting operations be prepared for every applicable project, and for each type of lift on a project. 1. The plan shall demonstrate adherence to Amtrak safety rules. 2. The plan shall demonstrate constructibility. 3. The plan shall minimize impact to rail operations. 4. The approved plan will provide the basis for field inspection/ verification of the actual work. B. Preparation, review and approval of the Crane/ Hoisting site-specific work plan does not relieve the Contractor from meeting other Amtrak requirements for adequate planning and documentation of proposed work procedures within the Right-of-Way of the railroad.. C. Current Amtrak safety rules shall be adhered to in every respect. D. Use of this specification is as required by Amtrak, as described in Amtrak Engineering Practice EP3014.

Award

Bridges / Tunnels

$3,133,900.00

Public - State/Provincial

Paving, Site Work

216

19

9

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
243
Bidding Soon
2,870
All Active Projects
1,326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

June 5, 2024

img_map_placeholder

To Be Determined, North Kingstown, RI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.