BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Duvall, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work in this contract includes edge or full width roadway planing, patching, base repairs, 2" Overlays, striping, utility adjustments and ADA ramp retrofits for approximately one third of a mile of roadway along NE 150th St in the City of Duvall and other related activities as specified in the contract documents. This project is partially funded with TIB funds. The Work must be completed within 60 working days after the commencement date stated in the Notice to Proceed and/or the overlay shall be substantially completed by August 23, 2024, whichever is sooner. The Bidder shall guarantee the total Bid price for a period of 60 calendar days from the date of Bid opening. All communications relating to the Project shall be directed to the following Project Representative prior to the opening of the Bids. Benjamin Ressler, P.E., Senior Project Manager, 14525 Main Street, Duvall, WA 98019, 425-939-8046, benjamin.ressler@duvallwa.gov DESCRIPTION OF WORK (March 13, 1995) This Contract provides for the pavement preservation improvements of City of Duvall streets including HMA grind and overlay, full depth HMA pavement repairs, roadway channelization, utility adjustments, guardrail improvements, ADA ramp upgrades, and other necessary work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The Project Manager assigned to answer questions regarding these bid documents and to show this project to prospective bidders is: Benjamin Ressler 14525 Main Street NE Duvall, WA 98019 (425) 939-8046 City Contacts: Project Manager: Benjamin Ressler, P.E., 425.939.8046 City Engineer: Larissa Grundell, P.E., 425.939.8040 PW Director: Steve Leniszewski, P.E., 425.939.8042 TIB No: 3-P-802(006)-1 Estimate: $490,000 for Schedule A Estimate: $50,000 for Schedule B

Award

Roads / Highways

$102,414.00

Public - City

Paving, Site Work

27

9

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
48
Bidding Soon
866
All Active Projects
328
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.