BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Oakdale, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://theconstructionbroadsheet.com/tutor-perinis-lunda-wins-million-minnesota-bridge-contract-p1796-175.htm Tutor Perini Corporation said Thursday that the City of St. Paul, Minnesota, has awarded its subsidiary Lunda Construction Company with an approximately $53.6 million contract for the replacement of a city bridge and associated infrastructure. The total project cost, including demolition, according to the city, is $92.4 million. The 1980s-era Third Street-Kellogg Bridge, according to the city, is an important connector for residents and typically saw traffic of almost 14,500 vehicles per day when all of the span's four lanes were open. However, since 2014, traffic has been restricted to three lanes and a single six-foot-wide sidewalk since September 2014 in order to keep weight off of structurally deficient areas of the bridge. The inadequacies of the current bridge, St. Paul officials said, prevent it from meeting the future needs of the community as well as the city's plans for more multimodal options, including bus rapid transit. Tutor Perini said Lunda's scope of work includes: A new bridge with four lanes of traffic – two in each direction; A concrete barrier-separated trail on both sides of the roadway, with each 12-foot-wide trail able to accommodate bicycles and pedestrians; Reconstruction of two intersections to improve safety and accessibility for pedestrians and vehicles, as well as bus rapid transit service. Tutor Perini said Lunda is expected to begin construction in the third quarter of this year and reach substantial completion in the fall of 2027. St. Paul officials said the length of the timeline takes into consideration several factors including: multiple intersections, busy railroad tracks under the bridge, a road that must stay open so that crews have access to power and sewer, special protections and work methods related to underground utility tunnels and potential flooding from the Mississippi River. ____________________________________ City of Saint Paul Public Work Department is looking for bids on Kellogg-3rd Bridge reconstruction project Q And A Close: 04/24/2024 02:00:00 PM State Project No. 000-000-000 B—1203

Post-Bid

Bridges / Tunnels

$2,270,000.00

Public - City

Demolition, New Construction, Paving, Site Work

34

14

13

5

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
85
Bidding Soon
824
All Active Projects
329
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

July 15, 2024

img_map_placeholder

3rd St N, Oakdale, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.