Site work for a water / sewer project in San Marcos, California. Completed plans call for site work for a water / sewer project.

Q&A Deadline May 20, 2024 at 10:00 a.m. (PDT) Bidders must be registered on the Vallecitos Water Districts PlanetBids portal in order to submit questions and receive addendum notifications. Deadline for questions shall be at 5:00 p.m. on Tuesday, May 7, 2024 The CHLORINE CONTACT TANK EXPANSION PROJECT AND MEADOWLARK WATER RECLAMATION FACILITY CONVERSION TO SODIUM HYPOCHLORITE PROJECT (Work) consists of the expansion of the existing chlorine contact tank and the construction of a new sodium hypochlorite storage and feed facility and removal of an existing chlorine gas storage and feed facility at the Meadowlark Water Reclamation Facility in Carlsbad, California, and the modifications and demolition of various components, as fully described in the Contract Documents (Work). Chlorine Contact Tank Expansion Project (Work Order No. 250264) The Meadowlark Water Reclamation Facility (MRF) has two existing chlorine contact tanks (CCTs), which is the final recycled water treatment process responsible for disinfection. The CCTs convey a peak flow of 5.0 million gallons per day (MGD). Successful completion of the CCT Expansion will provide a third CCT basin to the system, per Plan resulting in a 1.5 MGD flow capacity increase to the disinfection treatment process. The location of the work is generally described above and fully described in the Contract Documents. All work under this Contract shall be completed within Three Hundred SixtyFive (365) calendar days from the date noted in the NOTICE TO PROCEED. The estimated construction cost is $17,800,000. It is the responsibility of each prospective Bidder to download and print all Contract Documents for review and to verify the completeness of Contract Documents before submitting a Bid. Any addenda will be posted on website. It is the responsibility of each prospective Bidder to check website on a daily basis through the close of bids for any applicable addenda or updates. The District does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Contract Documents. Information on website may change without notice to prospective Bidders. The Contract Documents shall supersede any information posted or transmitted Bidders must be registered on the Vallecitos Water District's PlanetBids portal in order to submit questions and receive addendum notifications. Deadline for questions shall be at 5:00 p.m. on Tuesday, May 7, 2024. Because of the time necessary to notify bidders, no addenda will be issued within 72 hours of the date set for the opening of Bids. SPECIAL NOTICE ABOUT COVID-19: This project consists of essential work and will therefore proceed unless appropriate governmental authorities order the work to cease. Bidders shall comply with the requirements provided in the section titled, "COVID-19 Safety Measures," of the Special Provisions. Key prevention practices include, but are not limited to, physical distancing, face coverings, frequent handwashing, regular cleaning and disinfection, and training employees on preventing the spread of COVID-19. Note: The original security (bid bond) must be mailed or delivered to the Vallecitos Water District, Attn: Ryan Morgan/Engineering Department, at 201 Vallecitos de Oro, San Marcos, CA 92069, on or before the day and hour set for the opening of bids. Bid Bonds not marked as being received by District personnel on or before the day and hour of bid opening will be rejected. The sealed envelope should be plainly marked on the outside, "SEALED BID SECURITY FOR CHLORINE CONTACT TANK EXPANSION PROJECT AND MEADOWLARK WATER RECLAMATION FACILITY CONVERSION TO SODIUM HYPOCHLORITE PROJECT - DO NOT OPEN WITH REGULAR MAIL." Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Award

Water / Sewer

$16,212,780.00

Public - City

Site Work

109

57

54

9

Subscribe For Documents

96 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
97
Bidding Soon
2,207
All Active Projects
992
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

August 15, 2024

img_map_placeholder

Multiple Locations, San Marcos, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.