BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2024 at 7:00 PM

Updated May 24, 2025

Remodeling and renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a one-story above grade laboratory facility; and for the remodel of a laboratory facility.

As of November 15, 2024 construction is in the final stage. All subtrades have been filled. The construction manager RFP follows below for reference. ___________________________________________________________________ Question Deadline 05/17/2024 at 12:00 PM CT The Project will relocate researchers from the Institute of Translational Neuroscience (ITN) from the Wallin Medical Biosciences building (WMBB) to the Molecular and Cellular Biology Building (MCB). The program includes open lab benches, lab support spaces, and offices arranged to fit within the existing rooms and available spaces on MCB 5th Floor. Remodeling is anticipatedwith the existing equipment to be relocated with anticipated modifications necessary to support the new location of the equipment Indicate the percent of wages for construction workers that the Respondent will charge under 6.2.3 and 6.2.4 of the Contract as full payment for costs paid or incurred by the Respondent for taxes (SUTA, FUTA, and FICA), workers compensation insurance contributions, assessments and benefits required by law or collective bargaining agreements, and for personnel not covered by such agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations, and pensions. The University reserves the right to contact any noted references, consider other references, or consider Respondent's documented past performance at the University. The project relocates six PI's plus staff, currently located on floors 3 and 4, from the Institute of Transitional Neuroscience (ITN) in Wallin Medical Bioscience Building (WMBB) to available (vacant) space on level 5 in the Molecular and Cellular Biology Building (MCB). Previously, Moos 3 was being considered for this relocation but the project was cancelled due to cost. The ITN program relocation to MCB includes occupying existing open bench space, lab support (including animal behavior), and office workspace in MCB. This project minimizes changes to Level 5 in MCB: o Existing open lab, LER, and various lab support spaces will remain as-is and be re-purposed or modified to meet the needs of ITN. o Select lab support spaces will be remodeled to support the ITN program. o Identified offices will require updated finishes. The project may include Alternate 1 and Alternate 2, air valve replacement, as identified in the RFP Documents.

Under Construction

Laboratories

$1,700,000.00

Public - State/Provincial

Remodeling, Renovation

6

8

5

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
136
Bidding Soon
1,558
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

August 1, 2024

Project location map

Multiple Locations, Minneapolis, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.