BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and remodeling of a municipal facility in Post Falls, Idaho. Completed plans call for the remodel of a municipal facility; and for site work for a municipal facility.

https://cdapress.com/news/2024/jun/19/new-timeline-added-for-city-hall-remodel-post-falls/ POST FALLS — A $1.2 million remodeling project for the City Hall building has been delayed until this year after additional changes were incorporated into the plans. The City Council initially approved the project in March 2023, with the renovation work originally slated for last summer and fall following a design phase. A $70,270 professional services agreement was awarded to Spokane-based Bernardo Wills Architects to handle the design. The 16-year-old City Hall building will undergo extensive interior renovations over a six-month construction period. Funding for the project will come from the city's facilities account. -ADVERTISEMENT- The planned improvements include removing three underutilized lobby areas, adding a family restroom in the rotunda and enhancing security measures throughout the building to enable better after-hours staff access. Additionally, the rotunda will receive acoustic and spatial upgrades for improved accessibility. Six new offices will be created for the legal, administrative and finance departments, along with extra workspaces for prosecution support staff. According to John Beacham, public works director, the remodeling scope expanded, necessitating an adjusted timeline. "There are several major elements for the project: the architect for design and construction administration, the general contractor (Dardan Enterprises) for the major work and smaller contracts with a security vendor, audio/visual vendor and furnishings vendor," Beacham said. The audio/visuals, security and furnishing vendors have not been finalized. Dardan Enterprises, the low bidder, is creating the construction schedule, while Bernardo Wills Architects is handling the design aspects. Minor modifications to the council chambers' layout and minor building repairs are also part of the project. An underutilized space will be converted into a conference room to provide additional meeting facilities. Some office and workspace changes stem from a 2021 facilities needs assessment that projected an increase in future staffing requirements. ------------------------------------------- One Addendum will be issued no later than April 18, 2024. All questions must be received by the Architect no later than April 15, 2024. Direct any questions regarding this Project to Licia LeGrant with Bernardo Wills Architects at llegrant@bernardowills.com. Project Identification: City of Post Falls - City Hall Remodel 1. Project Location: 408 N. Spokane Street, Post Falls, ID Project cost range is anticipated to be: $950,00.00 - $1,165,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. TIME OF COMPLETION AND LIQUIDATED DAMAGES A. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. 1. Substantial Completion is required on or before one hundred eighty (180) calendar days from the issuance of Notice to Proceed. 2. Final Completion is required on or before thirty (30) calendar days from determination of Substantial Completion. 3. Liquidated Damages in the amount of seven hundred fifty ($750) dollars per calendar day will deducted from the Contract amount if durations for Substantial Completion are not achieved. 4. Liquidated Damages in the amount of five hundred ($500) dollars per calendar day will deducted from the Contract amount if durations for Final Completion are not achieved. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $950,00.00 - $1,165,000.00

Post-Bid

Municipal

$1,165,000.00

Public - City

Remodeling, Site Work

36

13

10

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
108
All Active Projects
36
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 20, 2024

img_map_placeholder

408 N Spokane St, Post Falls, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.