BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Klamath, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Requa Day Park Project Notice is Hereby Given That the Yurok Tribe is Requesting Sealed Bids From Qualified Construction Firms for the Building/renewal/remodeling of the Requa Resort. 1. The Scope of Work for the Requa Day Park Project Includes Ensuring Adherence to Safety Standards, Constructing a 30x30 Gathering Gazebo and Foundation, Installing a 10' High Screen Fence for Boat Dock Storage, Optimizing Parking Lot Striping, Installing Bollards for Safety, Setting Up Fire Pits and Bbq Pits With Stability Footings, Concrete Pads for Benches, Cleaning Campsites and Disposing of Debris, Upgrading Restroom Facilities, Painting Interior and Exterior Walls With Epoxy Paint, Pressure Washing Facilities, Installing Trash Bins With Bear Locks, Upgrading Lighting and Switches for Visibility, and Ensuring Compliance With Tero Tax, Bonding, and Insurance Requirements. 2. Qualifying Firms Are Asked to Submit a Narrative of Their Qualifications, Examples of Similar Projects, Team Resumes, and Pricing for Construction Services The Project Area is at the Requa Resort at the End of Mouth of Klamath Road Below the Requa Inn. 1. General Conditions: o Ensure adherence to all relevant safety and regulatory standards throughout the project. o Provide necessary documentation and permits for construction activities. 2. Shelter Structure: Construct foundation and one 30x30 gathering gazebo for shade and tables. o Ensure structural integrity and durability of the shelter. 3. Screen Fence: o Install 160 linear feet of 10' high screen fence to hide boat dock storage. o Utilize materials that blend with the park's aesthetics and environment. 4. Parking Lot Striping: o Stripe the parking lot to optimize parking space and traffic flow. 5. Bollards: o Install 24 bollards for safety and traffic management purposes. 6. Fire Pits and BBQ Pits: o Install six pre-engineered masonry fire pits (36" by FIREROCK) and six Pilot Rock Q-20 B2 20" charcoal grills. o Provide footings for BBQ pits to ensure stability and safety. 7. Campsite Cleanup and Debris Disposal: o Clean and clear campsites of debris and waste. o Dispose of debris in compliance with environmental regulations. 8. Restroom Facilities: o Install six new restroom fixtures, five partitions, and bath accessories. o Replace three exterior doors while retaining existing frames and hardware. 9. Painting: o Paint interior and exterior walls of park facilities approximately 832 square feet. o Apply epoxy paint on floors for durability and easy maintenance. 10. Clean and Pressure Wash: o Clean and pressure wash park facilities to maintain cleanliness and aesthetics. 11. Trash Bins with Bear Locks: o Install two trash bins with bear locks (BELSON Model: TB GRIZZLY) for waste management and wildlife protection. 12. Lighting and Switches: o Install new lights and switches for improved visibility and safety. 13. TERO Tax, Bonding & Insurance: o Ensure compliance with TERO tax requirements. o Provide necessary bonding and insurance coverage for the project. 14. Project Management: o Assign a dedicated project manager to oversee all aspects of the project. o Coordinate with subcontractors, suppliers, and stakeholders to ensure timely completion. o Monitor project progress and address any issues or concerns promptly. 15. Documentation and Reporting: o Maintain comprehensive records of all project activities, including permits, approvals, and inspections. o Generate progress reports to keep stakeholders informed of project status and milestones. o Document any changes or deviations from the original scope of work. 16. Environmental Considerations: o Minimize environmental impact during construction by implementing best practices for erosion control and waste management. o Dispose of construction waste in accordance with environmental regulations. Preserve and protect natural habitats and wildlife within the project area. 17. Closeout Procedures: o Complete all necessary closeout procedures, including final inspections and approvals. o Ensure proper documentation of project completion and handover to the client or relevant authorities. o Address any outstanding issues or deficiencies identified during the closeout process.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
75
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.