BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2025 at 8:00 PM

Updated May 20, 2025

Site work and paving for a mixed-use development in Klamath, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of 04/14/2025 - Short listed are: 1. Barnard-Traylor-Meyers, JV - The entities of Barnard Traylor Myers, JV consists of Barnard Construction Company (Bozeman, MT), Myers & Sons Construction (Sacramento, CA), and Traylor Bros. (Evansville, IN). 2. Kiewit Infrastructure West Co. Highway 101 Last Chance Grade Permanent Restoration Project Proposers interested in providing CMGC services, herein referred to as Construction Manager, will partner with the Department's design team on this Project. As part of the Project team, the selected Construction Manager may provide input on schedule, phasing, constructability, cost and estimates, value engineering, and plan review throughout the design process. In addition to aiding the design process, the selected Construction Manager will be asked to prepare and submit a proposed price for the labor, equipment, and materials that will be required to construct the Project based on the design process, plans, specifications, and estimate packages after the Office Engineer review of the Project. If the proposed price is accepted by the Department, a Construction Contract will be issued to the Construction Manager after the completion of the preconstruction phase so that construction of the Project can begin. If the proposed price is not accepted by the Department, the Department, in its sole discretion, reserves the right to end the Construction Manager's participation in the project development process at the completion of the design phase and advertise the Project. Although the selected Construction Manager will be contracted for both the design and construction services of this Project through this selection process, the selected Construction Manager is not guaranteed to receive a Construction Contract to perform the construction if services are terminated at the completion of the design phase. Final Date for Receipt of Proposers Questions 1/17/2025 Only written inquiries will be accepted California Department of Transportation Division of Procurements and Contracts 1727 30th Street Sacramento, California 95816-7006 Attention: Denetia Floyd-Smith, Contract Analyst e-mail: denetia.smith@dot.ca.gov Anticipated Notice to Proceed 5/30/2025 Anticipated Award of Construction Contract 10/1/2030 Construction Complete 12/1/2039. The estimated cost of this CMGC Project (in 2031 US dollars) is $1.75B to $3.25B for construction capital and $200M to $300M for Right of Way capital (including utility relocation). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$300,000,000.00

Public - State/Provincial

Paving, Site Work

1

5

126

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
9
Bidding Soon
136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.