BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2024 at 8:00 PM

Updated April 30, 2024

Site work and paving for a road / highway in Tremont, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of April 23, 2024, this project has not yet been awarded. The project is expected to be awarded on April 24, 2023. City/County : Tazewell Description: 1.218 Miles--- Hma Surf Rem Butt Jt, Hma Sc Il-9.5 C N50 and Aggregate Shlds B Spl 256 Sq Yd Hma Surf Rem Butt Jt; 18 Sq Yd Temporary Ramp; 12,107 Pound P Bit Matls Tack Ct; 1,841 Ton Hma Sc Il-9.5 C N50; 42 Ton Incidental Hma Surf; 684 Ton Aggregate Shlds B Spl; 644 Foot Short Term Pavt Mking; 213 Foot Shrt Trm Pavt Mk Rem; 1 L Sum Traf Cont & Prot Spl Project Location: FAS 476 Baer Rd.(Allentown Rd. (CH 5) southerly 6,433 LF to Tremont Co-op grain elevator) Tremont Road District ILDOT - 24-18000-00-GM - HMA Surf Rem Butt Jt

Award

Roads / Highways

$360,172.00

Public - County

Paving, Site Work

13

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
80
Bidding Soon
1,188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

May 15, 2024

Project location map

Baer Rd, Tremont, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.