Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2024 at 8:00 PM

Updated April 30, 2024

Site work for a mixed-use development in Rohnert Park, California. Completed plans call for site work for a clubhouse / community center; and pipeline.

The work is described generally but not limited to,trenching and replacing an existing gasservice line from the existing gas meter to the Community Center building, and all otherincidentalsto perform the work properly. Please refer Parts, Drawings, and Attachments for detailed information. The Contractor must begin work within fifteen (15) calendar days after official notice by the Project Manager to proceed with the work and must diligently prosecute the same to completion within 40 calendar days calendar days of that Notice. Per California Civil Code Section 9550, a payment bond in the amount of one hundred percent (100%) of the bid total will be required from the successful bidder for bids exceeding twenty-five thousand dollars ($25,000). The bond must be provided within fifteen (15) calendar days from notice of award and prior to the performance of any work. A performance bond and bid bond must also be provided for bids exceeding twenty-five thousand dollars ($25,000). The City reserves the right, in its sole discretion, to reject any or all bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. The City may reject any and all bids and waive any minor irregularity in the bids.

Bid Results

Pipeline

$102,464.00

Public - City

Site Work

5

7

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
129
Bidding Soon
2,847
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 27, 2024

Project location map

5405 Snyder Ln, Rohnert Park, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed