BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2024 at 8:00 PM

Updated August 1, 2024

Site work and paving for a sidewalk / parking lot in Rohnert Park, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Trustees of the California State University will receive sealed bid proposals in CSUBUY for furnishing all labor and materials for construction of the Pathway Improvements Project, for Sonoma State University. Contact:Tracie Schroeder schroedert@sonoma.edu Contact:Joy Sun sunm@sonoma.edu Question Deadline 06/28/2024 at 2:00 PM PT Provide all equipment, labor, and materials to recondition (Overlay) walk paths located South of the Art building complex and the campus lake. See attached mapping of area and verify exact locations and quantities in field. Provide tentative schedule for work and completion date. Provide traffic control plan and personnel as needed. Conform to all state and federal regulations. Work for this scope of work is to be completed per all California codes and specifications. All overlay asphalt shall be installed to provide draining of water off edges and minimal ponding of water. Overlay should not encroach on any underground utilities however all tree root removal and existing tie ins will need to have underground utilities reviewed prior to work being done. All manholes, valve boxes, electrical boxes in existing pathways shall be flush with pavement. Provide mix design for 2" overlay using 1/2 or 3/4 " aggregate. Grind all start and end points of existing pavement edges for smooth transitions, use tack coating on all existing edges and remove debris off campus. Grind / Remove sections of existing roots currently lifting existing walk path and remove off campus. Provide any necessary signage, barricades needed to keep unauthorized personnel out of work area. Any existing signage, sprinkler piping / system, electrical will be repaired or replaced if damaged. The existing surface shall be swept clean of all dust, dirt, and other loose material with hand brooms or through the use of approved mechanical sweepers. Where existing dust and dirt cannot be satisfactorily removed by brooming, it may be necessary to flush the asphalt surface with water. If flushing is necessary, the Contractor shall furnish the necessary equipment for flushing. All storm drain must be protected from any water intrusion. Coordinate with landscaping to shut down sprinkler system during

Bid Results

Sidewalks / Parking Lot

$244,825.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
120
Bidding Soon
2,718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 9, 2024

Project location map

1801 E Cotati Ave, Rohnert Park, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.