Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Moose Pass, Alaska. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
As of November 8, 2024, this solicitation is still in the negotiation phase. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: RFP/PSA number: .. : 25242037 Project Numbers-State/Federal.. : CFHWY00943/0A32025 Project Site (City, Village, etc.).. : Moose Pass, Alaska The Contractor shall provide design services for the Seward Highway: Sterling Hwy Intersection Improvement project. The project will redesign the existing intersection to improve Interstate to Interstate traffic movements and safety. Design services include: Environmental Activities, Wetlands Delineation, Public Involvement, Surveying, Preliminary Engineering, Avalanche Mitigation Engineering, Hydrologic and Hydraulic Design, Traffic Safety Analysis, Electrical Design, Utility Relocation Coordination, Design Study Report, Erosion and Sediment Control Plan, Plans, Specifications, & Engineers Estimate, Assistance During Bidding, Assistance with Design Project Closeout, and Assistance During Construction. The Contracting Agency may add by amendment other services as described on the Proposed Statement of Services at a future date, but it is under no obligation to do so. Anticipated period for performance-Begin/End: June 2024 through January 2027 AK DOT - RFP Engineering - Sterling Hwy Intersection Improvements Design Services The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$1,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
Sterling Hwy & Seward Hwy, Moose Pass, AK
Related To This Project
Moose Pass, AK
--
Moose Pass, AK
Bid Date: Dec 17 2021
Moose Pass, AK
Bid Date: Feb 22 2023
Moose Pass, AK
Bid Date: Apr 29 2019
Kenai, AK
Bid Date: Apr 25 2024
Anchorage, AK
Bid Date: Apr 23 2024
Fairbanks, AK
Bid Date: May 06 2024
Craig, AK
Bid Date: May 28 2024
Seldovia, AK
Bid Date: Apr 23 2024
Anchorage, AK
Bid Date: Apr 17 2024
Soldotna, AK
Bid Date: Jun 28 2024
Thorne Bay, AK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.