Published August 6, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving, outdoor lighting and new construction of a civil project in Boggs Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.

As of August 6th, 2024, this project is expected to begin after labor day. for the Construction of a High-speed Interchange Between I-99 and I-80 at the Existing Exit 161 in Centre County, Spring and Marion Townships, Commonwealth of Pennsylvania State Route 0080, Section B18 at the Locations as Follows: State Route 0080 From Segment 1584 Offset 0536 to Segment 1620 Offset 2312. State Route 0080 From Segment 1585 Offset 0302 to Segment 1625 Offset 0744. Also Including State Routes: Sr 0099 and Sr 1018. Work Includes the Design and Construction of 3 Design-build Multi-span Continuous Composite Curved Steel Girder Bridges, Also Construction of 7 Additional Bridges, 4 Walls, 5 Box Culverts, 7 Sign Structures, and 3 Dms Boards. Construction Includes New and Rebuilt Roadway and Ramps Involving Base, Binder, and Wearing Courses, Drainage System Improvements, Its Devices, Guide Rail, Pavement Markings, Stream Improvements, Highway Lighting, and Miscellaneous Construction as Indicated on the Approved Drawings for a Total Construction Length of Approximately 40,921 Feet (7.75 Miles). Project Cost Range: $250,000,000.00 - $274,999,999.99 Federal Project Status: Federal Oversight Structure Work: 40.00% Pre-bid Meeting: Mandatory Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Relocation/new Construction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Exit 161 Bellefonte Int *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room. In compliance with the Americans with Disabilities Act of 1990, the Department has scheduled the pre-bid conference at a facility which is accessible to persons having disabilities. Any person having special needs or requiring special assistance is requested to contact: Craig Sattesahn, P.E. Project Manager at (814) 765-0678 by Monday, April 22, 2024, in order that special needs may be accommodated and/or assistance provided. Direct any questions regarding the pre-bid conference to Craig Sattesahn, P.E. Project Manager at (814) 765-0678.

Award

Roads / Highways

$259,100,851.00

Public - State/Provincial

New Construction, Outdoor Lighting, Paving, Site Work

2796

25

651

10

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Commissioning of Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Drilled Caissons, Caissons, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Waterway Construction and Equipment, Waterway Scour Protection, Wall Scour Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Grinding Equipment, Finishing Equipment, Grinding Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
42
Bidding Soon
580
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

September 3, 2024

img_map_placeholder

Multiple Locations, Boggs Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Exit 161 Bellefonte Int

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.