Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a clubhouse / community center in Miami Beach, Florida. Completed plans call for the renovation of a clubhouse / community center.
The City of Miami Beach Facilities and Fleet Management Department requests your quote for the furnishing and installation of window blinds at the North Beach Ocean Center, Unidad of Miami Beach, pursuant to and in accordance with the specifications contained herein. Question Deadline 04/15/2024 at 10:00 AM ET Installation of Roller Shades to mitigate acoustic issues at NBOC / Unidad, focusing on the 2nd-floor main room, East and West Elevations (excluding angled ceiling at the rear of the room), and South Elevation. o The selected blinds contractor will execute this project by the specified requirements. o Contractor is to provide shop drawings identifying the elevations and blinds layout for approval from the City of Miami Beach's Project Manager. o The contractor shall visit the site to verify the estimated quantities, locations, and overall conditions of the existing site. o The contractor shall use only those cleaning materials and methods that will not create hazards to health or property and will not damage surfaces The contractor shall provide a detailed Project Schedule within four (4) working days of PO issuance. o The contractor shall furnish the Owner with a closeout package including As-Built drawings and Warranty Documents. o Blinds colors to be submitted for final approval to the Project Manager. o Blind samples are to be sent to the Project Manager. o The blinds contractor will install new blinds in the specified areas. Installation should be precise, ensuring proper alignment, security, and functionality of the blinds. o Contractor is to provide motorized or electronically controlled blinds. The blinds contractor will coordinate the necessary electrical connections with the city electrician. This includes wiring, switches, and controls to ensure seamless operation. o All blinds are to include a fascia. Blinds contractor is to provide samples for approval. o The blinds should be of high-quality material that complements the Unidad of Miami Beach Center's aesthetics. The style and color should be by the design guidelines and are to be approved by the Unidad of Miami Beach and the City's project manager. o Blinds must provide effective light control and privacy. Motorized blinds, if specified, should operate smoothly and quietly. o Blinds should contribute to energy efficiency by providing insulation and reducing glare. o All blinds should meet safety standards and be child-safe, if applicable. o The blinds contractor should ensure that all installations comply with local building codes and regulations. o The project timeline should be established in coordination with the NBOC - Unidad, to minimize disruption to daily operations. o Upon completion of the blinds replacement project, a walkthrough and inspection will be conducted to ensure that all work has been performed to the satisfaction of the Unidad of Miami Beach. Any necessary adjustments or corrections should be promptly addressed by the blinds contractor. Questions must be directed to PMPurchasing@miamibeachfl.gov.
Post-Bid
Clubhouse / Community Centers
$40,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2024
May 22, 2024
7251 Collins Ave, Miami Beach, FL
Related To This Project
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Jun 17 2024
Miami Beach, FL
Bid Date: Jun 28 2024
Miami Beach, FL
Bid Date: Apr 17 2024
Miami Beach, FL
Bid Date: Apr 17 2024
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.