BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in St Petersburg, Florida. Contact the soliciting agency for additional information.

The city of St. Petersburg is soliciting qualified companies to refinish gymnasium floors at city recreation centers on an as-needed basis. Contractor shall provide all labor, materials, supervision, tools, equipment, vehicles and other supplies necessary to perform all the work that includes, but is not limited to, or necessarily in the following sequence. City of St. Petersburg has a total of 12 gym floors at 11 locations. Gym floors are professionally refinished once every 6 years, sanding down to the original wood base. Every other year for maintenance, the floors are very lightly sanded, and refinished with 2 coats of oil based top coat. Due to COVID, there are 6 floors that require refinishing in 2024 and regular maintenance of all gym floors every other year upon maintenance schedule. The City of St. Petersburg is seeking responses from qualified vendors to refinish gymnasium floors at city recreation centers. The recreation centers are located at: Frank Pierce Gymnasium: approximately 7,682 square feet J. W. Cate Gymnasium: approximately 7,448 square feet Willis S. Johns Gymnasium: approximately 6,696 square feet Campbell Park Gymnasium: approximately 7,350 square feet Childs Park Gymnasium: approximately 7,200 square feet Roberts Recreation Gymnasium: approximately 6,528 square feet Lake Vista Recreation Center- 1401 62nd Ave. S. approximately 7,031 sq. ft. Thomas Jet Jackson- 1000 28th St. S. approximately 15,966 sq. ft. Walter Fuller Recreation Center-7891 26th Ave. N. approximately7,200 sq. ft. Gladden Park Recreation Center-3901 30th Ave. N. approximately 6768 sq. ft. Shore Acres Recreation Center-4230 Shore Acres Blvd. approximately 6735 sq. ft. Please see estimated maintenance schedule in attachments. Contractor shall sand existing floor to remove all paint and finish, cleaning and preparing floor with Bona Sport Sealer, screening entire surface, tack clean surface, layout and printing of gymnasium floor lines (two coats), repaint logo and apply floor finish according to manufacturers specific directions for Bona All Court - oil poly System product, a Maple Flooring Manufacturers Association (MFMA), approved gymnasium floor finish. Forty eight hours after the last finish coat by contractor, owner shall accept the floor from the contractor at which point he may apply for payment and consider his work completed. Questions All questions must be submitted via City's online sourcing system's Question & Answer feature no later than 3:00 pm on Wednesday, April 10, 2024. Questions will be answered via City's online sourcing system no later than 3:00 pm on Monday, April 15, 2024. More complex questions may require a written addendum to the solicitation. Explanations or instructions will not materially alter this solicitation unless they are in writing. Oral explanations or instructions given before the award of an Agreement will not be binding. If necessary, a written addendum to this solicitation will be issued and posted on the City's online

Post-Bid

Fitness / Rec Centers

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
54
Bidding Soon
951
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

img_map_placeholder

Multiple Locations, St Petersburg, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.