BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Gore, Oklahoma. Working plans call for site work for a bridge / tunnel.

The United States Army Corps of Engineers (USACE) Tulsa District will be hosting a Virtual Industry Forum on 19 April 2024 from 0900 to 1100 to provide information on upcoming spillway bridge replacement projects. With major spillway bridge replacement projects planned for the future, the District has identified the need to reach out to the construction community and highlight the opportunities available to industry. All prospective prime contractors or subcontractors interested to learn more about the Tulsa District's upcoming spillway bridge construction projects are invited to attend. The meeting will be held virtually (MS Teams). Both contracting and technical representatives will provide information on upcoming projects at Tenkiller Dam (Sequoyah County, OK) and at Fort Gibson Dam (Fort Gibson, OK). f you would like to attend, please send an email to Jon Larvick (contract specialist) at Jon.A.Larvick@usace.army.mil and provide names, company name, and emails of individuals you'd like invited. The Tenkiller Spillway Bridge will be the first project addressed. Fort Gibson Spillway Bridge could potentially be in the near future. Each Project's Magnitude of Price Range is between $25,000,000 and $100,000,000 (DFARS 236.204). Tenkiller Lake is a multi-purpose project providing flood risk management, hydroelectric power, water supply, navigation, fish and wildlife, and recreation. The project is operated for optimum flood risk management in the Illinois River basin as part of the larger Arkansas River Basin. The Tenkiller Lake Main Spillway bridge was originally constructed in conjunction with the dam by Tulsa District in December 1953. The bridge conveys Oklahoma State Highway 100 over the dam. The bridge consists of ten simply supported spans for a total bridge length of 600 feet. Each span is 52'-0" between bearing centerlines. The superstructure consists of two built-up, welded-steel, plate girders and a framing system of floor beams, stringers, and brackets. This two-girder steel structure lacks load path redundancy and is thus non-redundant and fracture critical. Due to welded construction, major elements lack internal redundancy. The Tenkiller Spillway Bridge project includes: Establishing continuous uninterrupted temporary power to all government facilities (Main Spillway Tainter Gates, Auxiliary Spillway) prior to beginning demolition and construction. Demolition of existing Bridge structure and catwalk (Lead abatement needed on catwalk). Mechanical platforms, tainter gates and overall Dam structure will need to be protected during demo and construction. Construct new steel catwalk and concrete bridge structure. Ultra High-Performance Concrete (UHPC)to be used on project. Roadway improvements to non-overflows of Dam. The Fort Gibson project will be similar, except that Fort Gibson Spillway Bridge has 30 spans compared to the 10 at the Tenkiller Spillway Bridge. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Bridges / Tunnels

$100,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
85
Bidding Soon
988
All Active Projects
487
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 6, 2024

img_map_placeholder

To Be Determined, Gore, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.