EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a municipal facility in Charlotte, North Carolina. Conceptual plans call for site work for a municipal facility.

As of March 4, 2025, this project is included in Mecklenburg County's Fiscal Year 2025-2030 CIP. Further information regarding a design firm and timeline for construction has not yet been established, but funding is allotted for FY 2025 and 2026. Program requires minimum of two acres of relatively level earth on which to drive heavy vehicles in order to "plant" utility poles and teach students to access, string lines on the poles, guard against falls and injury, and employ industry standards of safety protocol. An approximately 11,000 square foot lab building to include a classroom, offices, group toilets, secure equipment storage and open air storage for several utility trucks. Architecture and Engineering Design Teams are needed to provide Design Services for a proposed Line Worker Training Facility at the CPCC Harper Campus. Harper Campus Line Worker Training Facility: a. Building(s) to house program spaces including, but not limited to, classrooms, faculty offices, toilets, equipment and materials storage. b. Site development to include "pole yard" for student training, truck maneuvering and driver training pad, parking for "bucket" trucks and trailers. c. Total Project Budget: $5,082,243 The method of Contractor Selection has not been Determined at this time. All questions should be directed to Vicki Saville, AIA by phone or email. Contacting any other staff or faculty of CPCC will be basis for disqualification.

Conceptual

Municipal

$3,639,371.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
82
Bidding Soon
1,292
All Active Projects
586
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

img_map_placeholder

315 W Hebron St, Charlotte, NC

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP Architecture and Engineering Services - Harper Campus Line Worker Training Facility

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.