BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mountain Village, Colorado. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of April 30, 2024, project is not yet awarded. Project is no longer needed. Mountain Village Road Improvement; Chip and seal residential streets as designated by TMV. Provide materials, equipment, and labor for the application of a 3/8" chip and seal and fog coat to roads as designated by TMV. Adams Ranch Road from Mountain Village Blvd to Double Eagle Drive and Hood Park Drive. ADDITIONAL REQUIREMENTS: Approximately 27,150 sq. yds. of road surface will be included in the project. Prospective contractors will be responsible for measurement of the roads to be resurfaced and offer a bid price for the entire project. Date of project will be June 1- August 30. Application temperature must be 55 F and rising. Roads must be swept clean of loose chips within 24 hours of an application. Cleaning and surface prep before application shall be the responsibility of TMV. Fog coat application rate will be set once the embedment of the chips is checked. Traffic control shall be the responsibility of TMV. A project work schedule shall be submitted by the contractor with the RFP package. It is anticipated that construction will be a Monday - Saturday schedule with Sundays as a special approval case only. Water will be provided by TMV. All staging will be on site. All permits will be the responsibility of the TMV. Once the project has started the contractor must complete the project without pulling off the job unless approved by Town of Mountain Village. Violation of this requirement will result in penalties assessed at the end of the project. Chip seal installation shall follow the latest version of the CDOT Standard Specifications for Road and Bridge Construction. Section 409 and Section 702 Due to the lengthy time the fog coat takes to dry, the contractor must provide an acceptable plan on how the roads and businesses will remain open. Early A.M. application should be considered. Blackout no work dates due to festivals: June 19-24 Bluegrass July 4-7 Fourth of July The bid winner will be required to have a Mountain Village business license before work can commence. Bid will be awarded by Thursday April 19, 2024 Term of project: Date of award thru August 30, 2024 For more information call: Finn Kjome 970-729-3441 fkjome@mtnvillage.org

Project Abandoned

Roads / Highways

$188,888.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
76
All Active Projects
31
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

June 2, 2024

img_map_placeholder

Multiple Locations, Mountain Village, CO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.