Demolition, site work, paving and new construction of a bridge / tunnel in Morgan, Utah. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
New Bridge/Bridge Replacement County: Davis, Morgan, Weber This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. This is an Mbdc Project. Electronic Files Will Be on Contractor Zone. The Department Will Not Hold Retention on This Project. Per Utah State Code 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code 13-8-5 (1) for More Information. Wage Rates: Apply DBE Goal: 7.00% Engineer's Estimate: Greater than $40M but less than or equal $50M Mandatory Prequalification Required (Qualified Health Insurance Required) Each Bidder Must Submit an Electronic Bid Bond From an Approved Surety Company Through the Appropriate Clearinghouse, as Defined in the Udot E-bidding Guide, Using Udot's Bidding Business System or in Lieu Thereof, Cash, Certified Check, or Cashier's Check for Not Less Than 5% of the Total Amount of the Bid, Made Payable to the Utah Department of Transportation, Showing Evidence of Good Faith and a Guarantee That if Awarded the Contract, the Bidder Will Execute the Contract and Furnish the Contract Bonds as Required. Prequalification of Bidders is Required. Prior to Submitting a Bid, the Bidder Must Have on File With the Utah Department of Transportation a Completed and Approved Contractor's Application for Prequalification. Department Processing Time is 10 Working Days From Receipt of Properly Executed Documentation. UTDOT - I-84; Over Weber River and UPRR Bridge Repl, C-476 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$44,796,258.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2025
March 17, 2025
I-84, Morgan, UT
Related To This Project
Morgan, UT
Bid Date: Jul 18 2024
Morgan, UT
Bid Date: Jul 31 2024
Morgan, UT
Bid Date: Oct 31 2024
Morgan, UT
Bid Date: Apr 11 2019
Morgan, UT
Bid Date: Nov 07 2024
Morgan, UT
Bid Date: Jan 06 2025
Morgan, UT
Bid Date: Jan 30 2025
Morgan, UT
--
Morgan, UT
--
Morgan, UT
Bid Date: Apr 16 2024
Morgan, UT
Bid Date: Aug 01 2024
Morgan, UT
Bid Date: Mar 22 2024
Morgan, UT
Bid Date: Nov 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.