BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in San Mateo, California. Completed plans call for the renovation of a educational facility.

The projects generally consists of replacing & installing new flooring. All pre-qualification questionnaires will be received until 4:00 P.M., Friday May 3rd, 2024, through Quality Bidders using their web link at online Request for Information (RFI's) and Bid period questions relative to the building projects are to be submitted to Mark Herrera at mherrera@smfcsd.net and Billy Tran at btran@smfc.k12.ca.us by Wednesday May 1st no later than 2:00 pm. The Districts Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. As per specified locations and construction specifications provided by the District, the project consists of all labor, materials, equipment and services necessary to complete the following scope: Move all furniture in and out of rooms during pre/post construction, provide wall protection (At all schools) Demo and remove the existing carpet, VCT/LVT, sheet vinyl, and wall base (At all Schools) Provide proper floor preparation for all existing concrete subfloor areas receiving new flooring as per manufacturer specifications (At North Shoreview Montessori, LEAD, and Foster City Elementary) Remove existing moisture barrier membrane/system to expose subfloor (At Foster City Elementary Only) Furnish and Install specified moisture barrier system as per manufacturers specifications Furnish and Install new wood underlayment in all areas receiving new flooring as per manufacturer specifications (At Laurel Elementary and Abbott Middle School - Portables Only) Fill all subfloor cracks with specified filler as per manufacturer specifications (At North Shoreview Montessori, LEAD, and Foster City Elementary) Furnish and Install new specified entry walk off carpet tile, field carpet tile, resilient plank flooring, resilient sheet flooring, top set coved wall base and all related sundries and accessories. (At all schools)

Bid Results

Educational

$500,000.00

Public - City

Renovation

4

9

31

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
82
Bidding Soon
1,717
All Active Projects
733
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2024

June 10, 2024

img_map_placeholder

949 Ocean View Ave, San Mateo, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.