BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Los Angeles, California. Contact the soliciting agency for additional information.

The Department of Beaches and Harbors (DBH), as part of its own operations, maintains bathroom facilities at various beaches throughout Los Angeles County. DBH's Malibu and San Pedro facilities utilize septic systems to collect and treat public waste, and discharge into leach fields or an ocean outfall. The septic systems require routine maintenance such as cleaning filters, chemical adjustments, and UV bulb replacements to maintain proper functioning as intended, and to meet the water quality standards set forth in the Waste Discharge Requirements (WDR) issued by the State Water Resources Control Board. The waste materials must also be disposed of in a manner that complies with all Federal, State, County, and City laws and/or ordinances. Minimum Mandatory Requirements: Contractor must include copies of all valid certificates that demonstrate qualification to maintain the DBH septic systems: Certified AdvanTex(R) Service Provider Certified Microseptec Service Provider Tasks: To ensure the DBH's 18 septic systems (Exhibit 1) are properly maintained and functioning as intended and to meet the water quality standards set forth in the WDR for each site. Note that the pump outs are not included in this SOW. Deliverables and Bidder Responsibilities: Contractor is expected to perform maintenance activities in accordance with the Operation and Maintenance (O&M) Manual (Attachment B) for each septic system. Contractor will be provided telemetry access to all septic systems. All work performed should be recorded in the field, using Attachment A DBH Maintenance Inspection Form, and submitted to the Contract Administrator. Contractor is responsible for repair and chemical adjustments, as needed, and when effluent water quality does not meet the water quality standards. Contractor may be asked by DBH to assist the Monitoring and Reporting Consultant with accessing sampling points of the septic systems during the regular servicing visits. Remote System Monitoring Contractor shall inspect and calibrate all sensors and controls to assure proper performance and reporting of the telemetry unit. Contractor shall monitor the system for performance and respond to the system alarms. In the event a system alarm is received, Contractor shall first attempt to correct the system fault remotely. If the Minimum Mandatory Requirements: Contractor must include copies of all valid certificates that demonstrate qualification to maintain the DBH septic systems: Certified AdvanTex(R) Service Provider Certified Microseptec Service Provider Tasks: To ensure the DBH's 18 septic systems (Exhibit 1) are properly maintained and functioning as intended and to meet the water quality standards set forth in the WDR for each site. Note that the pump outs are not included in this SOW. Deliverables and Bidder Responsibilities: Contractor is expected to perform maintenance activities in accordance with the Operation and Maintenance (O&M) Manual (Attachment B) for each septic system. Contractor will be provided telemetry access to all septic systems. All work performed should be recorded in the field, using Attachment A DBH Maintenance Inspection Form, and submitted to the Contract Administrator. Contractor is responsible for repair and chemical adjustments, as needed, and when effluent water quality does not meet the water quality standards. Contractor may be asked by DBH to assist the Monitoring and Reporting Consultant with accessing sampling points of the septic systems during the regular servicing visits. Remote System Monitoring Contractor shall inspect and calibrate all sensors and controls to assure proper performance and reporting of the telemetry unit. Contractor shall monitor the system for performance and respond to the system alarms. In the event a system alarm is received, Contractor shall first attempt to correct the system fault remotely. If the

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

5

13

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,243
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.