Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Las Vegas, Nevada. Completed plans call for site work for a playground / park / athletic field.
Question Cutt off Date & Time 4/22/2024 08:30:00 PM (ET) Question Deadline 04/22/2024 at 5:30 PM PT Should you have any questions, please contact me at (702) 455-6277 or Geraldine.Cruz@clarkcountynv.gov Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The "project" of which the "Work" of the Contract is a part titled Siegfried & Roy Park: Playground Replacement and is located at 5525 S Maryland Parkway, Las Vegas, Nevada 89119. The "Work" is described in the Project Drawings and Divisions 01 through 33 of the Project Manual. Project No. 305048001 The work consists of the modernization of two (2) play areas of approximately 15,860 sf, one (1) water play feature of approximately 2,870 sf and two shade shelters of approximately 3,840 sf. Work scope includes removal of all existing resilient poured in place surfacing, concrete base, all play equipment in the play areas, existing poured in place surfacing in the water play area (keeping the concrete subsurface except where noted on plans), removal of all fabric shade panels within project limits, and installation of new 2-5-years-old and 5-12-years-old playground equipment. In addition, install new sub-surface and trench drain drainage systems, new safety surface tile system with new concrete base, Type 2 aggregate subbase, and earthwork/finishing grading; complete with keyway and cushion/wear course (tiles) in both playground areas. In the splash pad area, repair existing concrete base and install a complete new resilient surface course over the entire splash pad area over new and existing concrete base. Between the playground and water play area, install a new trench drain separating the surfacing types, complete with keyway for splash pad surfacing. Replace all existing shade panels within project limits with new fabric shade panels. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Subsurface Conditions, Selective Site Demolition, Concrete Forming and Accessories, Concrete Reinforcement, Site Cast-in-Place Concrete, Miscellaneous Metalwork, High Performance Coatings, Playground Equipment, Waterplay Surfacing, Fabric Shade Structures, earthwork, aggregate base, concrete paving, concrete pavement sealants, playground tile protective surfacing, basic electrical requirements, equipment wiring connections, hangers and supports for electrical systems, raceway and boxes for electrical systems, identification for electrical systems, led exterior lighting, landscape irrigation, turf and grasses, existing tree and plant protection, pvc pipe storm drainage, stormwater area drains and inlets, and geotechnical evaluation report. Contractor to provide construction fencing and barriers to safeguard construction materials and prohibit the use of existing areas where construction is taking place during construction. All patch / replaced finish materials are to match existing adjacent materials in both style and classification. Contractor shall use nondestructive vacuum excavation methods for all required site excavation on this project.
Post-Bid
Playgrounds / Parks / Athletic Fields
$450,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2024
June 3, 2024
5525 S Maryland Pkwy, Las Vegas, NV
Related To This Project
Las Vegas, NV
Bid Date: Apr 30 2024
Las Vegas, NV
Bid Date: May 16 2024
Las Vegas, NV
Bid Date: May 15 2024
Las Vegas, NV
Bid Date: May 14 2024
Las Vegas, NV
Bid Date: May 23 2024
Las Vegas, NV
Bid Date: Jun 06 2024
Las Vegas, NV
Bid Date: May 06 2024
Las Vegas, NV
Bid Date: May 03 2024
Las Vegas, NV
Bid Date: May 06 2024
Las Vegas, NV
Bid Date: May 09 2024
Las Vegas, NV
Bid Date: Apr 30 2024
Las Vegas, NV
Bid Date: May 23 2024
Las Vegas, NV
Bid Date: May 08 2024
Las Vegas, NV
Bid Date: Apr 18 2024
Las Vegas, NV
Bid Date: May 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.